X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234243301003

Well Details

Well ID: 0234243301003
Loading map...
Location: 00/01-33-023-24W4/3
Location Alias: 00/01-33-23-24 W4M
Location Alias 2: 00/01-33-023-24 W4/03
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 24
Section: 33
County/Municipality: Wheatland County
Well Name: PCP PCR 1C CAVALIER 1-33-23-24
Operator Name: Lynx Energy ULC
License Number: 0250307
License Date: 2001-02-01
License Status: Amended
Spud Date: 2001-02-07
Final Drill Date: 2001-02-09
Well Total Depth: 1248.00 m
Surface Hole Latitude: 50.989839
Surface Hole Longitude: -113.287184

For data sources see[1][2]

Well History

Date Event
2001-02-01 Obtained License
2001-02-07 Direction Drilling Operation Performed - Deviate
2001-02-07 Surface Casing Operation Performed
2001-02-09 Finished Drilling
2001-02-09 Well Log Performed
2001-02-09 Well Mode changed to Drilled and Cased
2001-02-10 Production Casing Operation Performed
2001-02-10 Rig Released
2001-02-19 Well Log Performed
2001-03-07 Perforation Treatment Performed - Jet Perforation
2001-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-12 Plug Back Performed
2001-12-02 Perforation Treatment Performed - Jet Perforation
2001-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-11 Perforation Treatment Performed - Jet Perforation
2001-12-11 Plug Back Performed
2008-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-04 Perforation Treatment Performed - Jet Perforation
2008-12-04 Plug Back Performed
2008-12-04 Well Mode changed to Abandoned Zone
2010-02-17 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-02-07 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-07 Perforation 1045.00 1048.00 7
2008-12-04 Perforation 653.00 656.00 13
2008-12-04 Perforation 624.30 625.30 13
2008-12-04 Perforation 603.10 604.10 13
2008-12-04 Perforation 599.40 600.40 13
2008-12-04 Perforation 521.60 525.10 13
2008-12-04 Perforation 508.90 509.90 13
2008-12-04 Perforation 487.20 491.20 13
2008-12-04 Perforation 479.80 480.80 13
2008-12-04 Perforation 472.00 475.00 13
2008-12-04 Perforation 460.50 462.50 13
2001-09-12 Packing Device Capped w/Cement 1027.00 1035.00 0
2008-12-04 Perforation 458.10 460.10 13
2008-12-04 Perforation 453.40 454.40 13
2008-12-04 Perforation 576.00 579.00 13
2008-12-04 Perforation 528.00 531.00 13
2008-12-04 Perforation 502.00 505.50 13
2008-12-04 Perforation 386.00 387.00 13
2008-12-04 Perforation 368.80 369.80 13
2008-12-04 Perforation 316.70 317.70 13
2008-12-04 Perforation 310.20 311.20 13
2008-12-04 Perforation 301.00 302.00 13
2001-12-02 Perforation 1003.50 1006.50 7
2008-12-04 Perforation 297.10 298.10 13
2008-12-04 Perforation 295.10 296.10 13
2001-12-11 Packing Device Capped w/Cement 987.00 995.00 0
2001-12-11 Perforation 819.00 822.00 7
2008-12-04 Packing Device Capped w/Cement 805.00 813.00 0
2008-12-04 Perforation 718.00 719.00 13
2008-12-04 Perforation 714.70 715.70 13
2008-12-04 Perforation 705.00 706.00 13

For data sources see[5]



References