X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234233408000

Well Details

Well ID: 0234233408000
Loading map...
Location: 00/08-34-023-23W4/0
Location Alias: 00/08-34-23-23 W4M
Location Alias 2: 00/08-34-023-23 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 23
Section: 34
County/Municipality: Wheatland County
Well Name: PCP CAVALIER 8-34-23-23
Operator Name: Lynx Energy ULC
License Number: 0165814
License Date: 1994-03-10
License Status: Issued
Spud Date: 1994-06-12
Final Drill Date: 1994-06-21
Well Total Depth: 1645.00 m
Surface Hole Latitude: 50.997291
Surface Hole Longitude: -113.124162

For data sources see[1][2]

Well History

Date Event
1994-03-10 Obtained License
1994-06-13 Surface Casing Operation Performed
1994-06-14 Direction Drilling Operation Performed - Deviate
1994-06-21 Finished Drilling
1994-06-21 Well Log Performed
1994-06-21 Well Mode changed to Drilled and Cased
1994-06-22 Production Casing Operation Performed
1994-06-22 Rig Released
1994-06-24 Well Log Performed
1994-07-07 Well Log Performed
1994-07-09 Perforation Treatment Performed - Jet Perforation
1994-07-09 Well Began Production
1994-07-09 Well Fluid changed to Crude Oil
1994-07-09 Well Mode changed to Pumping
1994-07-10 Well Fluid changed to Crude Oil
1994-07-10 Well Mode changed to Suspended
1994-08-02 Well Fluid changed to Crude Oil
1994-08-02 Well Mode changed to Flowing
1995-05-17 Well Fluid changed to Crude Oil
1995-05-17 Well Mode changed to Suspended
1995-05-25 Perforation Treatment Performed - Jet Perforation
1995-05-25 Well Log Performed
1995-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-31 Well Log Performed
1995-07-14 Well Began Injection
1995-07-14 Well Fluid changed to Water
1995-07-14 Well Type changed to Injection
1999-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-04-30 Plug Back Performed
2004-04-30 Well Fluid changed to Water
2004-04-30 Well Mode changed to Abandoned Zone
2004-04-30 Well Type changed to Injection
2004-05-28 Well Log Performed
2004-06-13 Perforation Treatment Performed - Jet Perforation
2004-06-14 Perforation Treatment Performed - Jet Perforation
2004-07-02 Perforation Treatment Performed - Fractured
2007-07-20 Perforation Treatment Performed - Jet Perforation
2007-07-20 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-06-14 849.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-09 Perforation 1588.00 1590.00 13
2004-06-13 Perforation 459.60 460.60 13
2004-06-13 Perforation 461.90 464.90 13
2004-06-13 Perforation 469.40 470.40 13
2004-06-13 Perforation 474.60 475.60 13
2004-06-13 Perforation 558.60 559.60 13
2004-06-13 Perforation 580.70 581.70 13
2004-06-13 Perforation 720.70 721.70 13
2004-06-13 Perforation 741.40 742.40 13
2004-06-13 Perforation 743.40 745.40 13
2004-06-13 Perforation 747.40 748.40 13
1995-05-25 Perforation 1583.00 1591.00 13
2004-06-13 Perforation 753.40 754.40 13
2004-06-14 Perforation 205.60 206.60 13
2004-06-14 Perforation 210.00 211.00 13
2004-06-14 Perforation 214.20 217.20 13
2004-06-14 Perforation 229.30 230.30 13
2004-06-14 Perforation 263.50 264.50 13
2004-06-14 Perforation 265.90 268.90 13
2004-06-14 Perforation 271.30 273.30 13
2004-06-14 Perforation 279.20 281.20 13
2004-06-14 Perforation 286.80 287.80 13
1995-05-30 Acid Treatment 1583.00 1591.00 0
2004-06-14 Perforation 296.10 297.10 13
2004-06-14 Perforation 298.60 299.60 13
2004-06-14 Perforation 306.10 307.10 13
2004-06-14 Perforation 313.30 314.30 13
2004-07-02 Fracture 205.60 754.40 0
2007-07-20 Perforation 530.50 532.00 17
1999-08-06 Acid Treatment 1583.00 1591.00 0
2004-04-30 Packing Device Capped w/Cement 1567.60 1575.60 0
2004-06-13 Perforation 320.00 322.00 13
2004-06-13 Perforation 322.80 323.80 13
2004-06-13 Perforation 455.60 456.60 13
2004-06-13 Perforation 457.90 458.90 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2510 0.0 0.0 0.0
1995 1306 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[6]

References