If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0234232505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.986476,"lon":-113.096524,"icon":""}]} |
| Location: 00/05-25-023-23W4/0 | |
| Location Alias: 00/05-25-23-23 W4M | |
| Location Alias 2: 00/05-25-023-23 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 023 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 25 | |
| County/Municipality: Wheatland County | |
| Well Name: ECA ECOG CAVALIER 5-25-23-23 | |
| Operator Name: Lynx Energy ULC | |
| License Number: 0310245 | |
| License Date: 2004-06-14 | |
| License Status: Issued | |
| Spud Date: 2004-09-29 | |
| Final Drill Date: 2004-10-12 | |
| Well Total Depth: 824.00 m | |
| Surface Hole Latitude: 50.986476 | |
| Surface Hole Longitude: -113.096524 |
| Date | Event |
|---|---|
| 2004-06-14 | Obtained License |
| 2004-09-29 | Surface Casing Operation Performed |
| 2004-10-12 | Finished Drilling |
| 2004-10-12 | Well Mode changed to Drilled and Cased |
| 2004-10-13 | Production Casing Operation Performed |
| 2004-10-13 | Rig Released |
| 2004-10-23 | Well Log Performed |
| 2005-01-04 | Perforation Treatment Performed - Jet Perforation |
| 2005-01-18 | Perforation Treatment Performed - Jet Perforation |
| 2005-01-24 | Perforation Treatment Performed - Jet Perforation |
| 2005-02-02 | Perforation Treatment Performed - Fractured |
| 2005-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2005-02-22 | Perforation Treatment Performed - Fractured |
| 2005-03-04 | Perforation Treatment Performed - Jet Perforation |
| 2005-03-20 | Perforation Treatment Performed - Fractured |
| 2005-06-21 | Well Began Production |
| 2005-06-21 | Well Fluid changed to Gas |
| 2005-06-21 | Well Mode changed to Flowing |
| 2010-01-05 | Perforation Treatment Performed - Jet Perforation |
| 2010-01-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-01-07 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-01-04 | Perforation | 750.00 | 752.00 | 13 |
| 2010-01-05 | Perforation | 738.00 | 739.00 | 13 |
| 2010-01-05 | Perforation | 733.10 | 734.10 | 13 |
| 2010-01-05 | Perforation | 455.50 | 456.50 | 13 |
| 2010-01-05 | Perforation | 453.50 | 454.50 | 13 |
| 2010-01-05 | Perforation | 451.00 | 452.00 | 13 |
| 2010-01-05 | Perforation | 405.10 | 406.10 | 13 |
| 2010-01-05 | Perforation | 309.50 | 310.50 | 13 |
| 2010-01-05 | Perforation | 271.30 | 272.30 | 13 |
| 2010-01-05 | Perforation | 269.10 | 270.10 | 13 |
| 2010-01-05 | Perforation | 258.00 | 260.00 | 13 |
| 2005-01-18 | Perforation | 722.00 | 724.00 | 13 |
| 2010-01-05 | Perforation | 250.00 | 252.00 | 13 |
| 2010-01-05 | Perforation | 247.00 | 248.00 | 13 |
| 2010-01-05 | Perforation | 242.50 | 243.50 | 13 |
| 2010-01-05 | Perforation | 237.50 | 238.50 | 13 |
| 2010-01-05 | Perforation | 194.50 | 195.50 | 13 |
| 2010-01-05 | Perforation | 290.00 | 294.00 | 13 |
| 2010-01-05 | Perforation | 229.00 | 233.00 | 13 |
| 2005-01-24 | Perforation | 687.00 | 688.50 | 13 |
| 2005-02-02 | Fracture | 687.00 | 688.50 | 0 |
| 2005-02-10 | Perforation | 674.50 | 676.00 | 13 |
| 2005-02-22 | Fracture | 674.50 | 676.00 | 0 |
| 2005-03-04 | Perforation | 613.00 | 615.50 | 13 |
| 2005-03-04 | Perforation | 609.00 | 611.50 | 13 |
| 2005-03-20 | Fracture | 609.00 | 615.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 4648 | 0.0 | 0.0 | 0.0 |
| 2006 | 8583 | 0.0 | 0.0 | 0.0 |
| 2007 | 8638 | 0.0 | 0.0 | 0.0 |
| 2008 | 8713 | 0.0 | 0.0 | 0.0 |
| 2009 | 8653 | 0.0 | 0.0 | 0.0 |
| 2010 | 8750 | 0.0 | 0.0 | 0.0 |
| 2011 | 8747 | 0.0 | 0.0 | 0.0 |
| 2012 | 8780 | 0.0 | 0.0 | 0.0 |
| 2013 | 8670 | 0.0 | 0.0 | 0.0 |
| 2014 | 8599 | 0.0 | 0.0 | 0.0 |
| 2015 | 8681 | 0.0 | 0.0 | 0.0 |
| 2016 | 8756 | 0.0 | 0.0 | 0.0 |
| 2017 | 8713 | 0.0 | 0.0 | 0.0 |
| 2018 | 8721 | 0.0 | 0.0 | 0.0 |
| 2019 | 8757 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]