X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234222302002

Well Details

Well ID: 0234222302002
Loading map...
Location: 00/02-23-023-22W4/2
Location Alias: 00/02-23-23-22 W4M
Location Alias 2: 00/02-23-023-22 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 22
Section: 23
County/Municipality: Wheatland County
Well Name: LOGIC ENERGY HUSSAR 2-23-23-22
Operator Name: Logic Energy Ltd.
License Number: 0290983
License Date: 2003-08-07
License Status: Suspension
Spud Date: 2003-08-10
Final Drill Date: 2003-08-13
Well Total Depth: 1534.00 m
Surface Hole Latitude: 50.965696
Surface Hole Longitude: -112.969357

For data sources see[1][2]

Well History

Date Event
2003-08-07 Obtained License
2003-08-10 Surface Casing Operation Performed
2003-08-13 Finished Drilling
2003-08-13 Well Log Performed
2003-08-13 Well Mode changed to Drilled and Cased
2003-08-14 Production Casing Operation Performed
2003-08-14 Rig Released
2003-09-24 Perforation Treatment Performed - Jet Perforation
2003-09-25 Well Log Performed
2003-10-10 Well Log Performed
2003-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-13 Perforation Treatment Performed - Jet Perforation
2003-10-13 Plug Back Performed
2003-10-14 Well Log Performed
2003-11-05 Well Began Production
2003-11-05 Well Fluid changed to Crude Oil
2003-11-05 Well Mode changed to Flowing
2003-12-03 Perforation Treatment Performed - Fractured
2003-12-16 Well Fluid changed to Crude Oil
2003-12-16 Well Mode changed to Suspended
2004-02-25 Well Fluid changed to Crude Oil
2004-02-25 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-24 Perforation 1495.50 1500.50 17
2003-10-13 Packing Device Capped w/Cement 1486.00 1495.00 0
2003-10-13 Perforation 1438.00 1439.00 17
2003-12-03 Fracture 1438.00 1439.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 37 0.0 0.0 0.0
2004 5545 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8415 0.0 0.0 0.0
2007 8746 0.0 0.0 0.0
2008 8266 0.0 0.0 0.0
2009 8076 0.0 0.0 0.0
2010 8697 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8471 0.0 0.0 0.0
2013 8404 0.0 0.0 0.0
2014 6496 0.0 0.0 0.0
2015 8459 0.0 0.0 0.0
2016 8609 0.0 0.0 0.0
2017 4463 0.0 0.0 0.0

For data sources see[5]

References