X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234212916020

Well Details

Well ID: 0234212916020
Loading map...
Location: 02/16-29-023-21W4/0
Location Alias: 02/16-29-23-21 W4M
Location Alias 2: 02/16-29-023-21 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 21
Section: 29
County/Municipality: Wheatland County
Well Name: APEL 102 HZ HUSSAR 16-29-23-21
Operator Name: TimberRock Energy Corp.
License Number: 0427277
License Date: 2010-12-08
License Status: Suspension
Spud Date: 2010-12-27
Final Drill Date: 2011-01-08
Well Total Depth: 2513.00 m
Surface Hole Latitude: 50.980368
Surface Hole Longitude: -112.889740

For data sources see[1][2]

Well History

Date Event
2010-12-08 Obtained License
2010-12-28 Surface Casing Operation Performed
2010-12-31 Direction Drilling Operation Performed - Horizontal
2011-01-03 Intermediate Casing Operation Performed
2011-01-08 Finished Drilling
2011-01-08 Well Mode changed to Drilled and Cased
2011-01-10 Well Log Performed
2011-01-13 Liner Casing Operation Performed
2011-01-14 Rig Released
2011-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-04 Perforation Treatment Performed - Open-Hole Completion
2011-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-16 Plug Back Performed
2015-10-27 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-31 1176.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-04 Multi-Stage Fracture 2067.30 2067.40 0
2011-03-08 Multi-Stage Fracture 1785.80 1785.90 0
2011-03-08 Multi-Stage Fracture 1897.50 1897.60 0
2015-10-15 Packing Device Capped w/Cement 1387.00 1406.50 0
2011-02-04 Multi-Stage Fracture 2179.70 2179.80 0
2011-02-04 Multi-Stage Fracture 2263.50 2263.60 0
2011-02-04 Multi-Stage Fracture 2375.70 2375.80 0
2011-02-04 Multi-Stage Fracture 2460.90 2461.00 0
2011-02-04 Multi-Stage Fracture 2498.70 2498.80 0
2011-02-04 Open Hole/Barefoot Completion 1562.00 2513.00 0
2011-03-08 Multi-Stage Fracture 1602.00 1602.10 0
2011-03-08 Multi-Stage Fracture 1700.70 1700.80 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-16 No Incident Encountered 0.00 0.00
2015-10-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References