If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234212916020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.980368,"lon":-112.88974,"icon":""}]} |
Location: 02/16-29-023-21W4/0 | |
Location Alias: 02/16-29-23-21 W4M | |
Location Alias 2: 02/16-29-023-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 21 | |
Section: 29 | |
County/Municipality: Wheatland County | |
Well Name: APEL 102 HZ HUSSAR 16-29-23-21 | |
Operator Name: TimberRock Energy Corp. | |
License Number: 0427277 | |
License Date: 2010-12-08 | |
License Status: Suspension | |
Spud Date: 2010-12-27 | |
Final Drill Date: 2011-01-08 | |
Well Total Depth: 2513.00 m | |
Surface Hole Latitude: 50.980368 | |
Surface Hole Longitude: -112.889740 |
Date | Event |
---|---|
2010-12-08 | Obtained License |
2010-12-28 | Surface Casing Operation Performed |
2010-12-31 | Direction Drilling Operation Performed - Horizontal |
2011-01-03 | Intermediate Casing Operation Performed |
2011-01-08 | Finished Drilling |
2011-01-08 | Well Mode changed to Drilled and Cased |
2011-01-10 | Well Log Performed |
2011-01-13 | Liner Casing Operation Performed |
2011-01-14 | Rig Released |
2011-02-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-04 | Perforation Treatment Performed - Open-Hole Completion |
2011-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-10-16 | Plug Back Performed |
2015-10-27 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-31 | 1176.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-04 | Multi-Stage Fracture | 2067.30 | 2067.40 | 0 |
2011-03-08 | Multi-Stage Fracture | 1785.80 | 1785.90 | 0 |
2011-03-08 | Multi-Stage Fracture | 1897.50 | 1897.60 | 0 |
2015-10-15 | Packing Device Capped w/Cement | 1387.00 | 1406.50 | 0 |
2011-02-04 | Multi-Stage Fracture | 2179.70 | 2179.80 | 0 |
2011-02-04 | Multi-Stage Fracture | 2263.50 | 2263.60 | 0 |
2011-02-04 | Multi-Stage Fracture | 2375.70 | 2375.80 | 0 |
2011-02-04 | Multi-Stage Fracture | 2460.90 | 2461.00 | 0 |
2011-02-04 | Multi-Stage Fracture | 2498.70 | 2498.80 | 0 |
2011-02-04 | Open Hole/Barefoot Completion | 1562.00 | 2513.00 | 0 |
2011-03-08 | Multi-Stage Fracture | 1602.00 | 1602.10 | 0 |
2011-03-08 | Multi-Stage Fracture | 1700.70 | 1700.80 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-10-16 | No Incident Encountered | 0.00 | 0.00 |
2015-10-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]