If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0234212206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.971326,"lon":-112.856368,"icon":""}]} |
| Location: 00/06-22-023-21W4/0 | |
| Location Alias: 00/06-22-23-21 W4M | |
| Location Alias 2: 00/06-22-023-21 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 023 | |
| Meridian: 4 | |
| Range: 21 | |
| Section: 22 | |
| County/Municipality: Wheatland County | |
| Well Name: PCP GLEICHEN 6-22-23-21 | |
| Operator Name: Lynx Energy ULC | |
| License Number: 0101100 | |
| License Date: 1983-03-30 | |
| License Status: Abandoned | |
| Spud Date: 1983-07-11 | |
| Final Drill Date: 1983-07-13 | |
| Well Total Depth: 833.00 m | |
| Surface Hole Latitude: 50.971326 | |
| Surface Hole Longitude: -112.856368 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1983-03-30 | Obtained License |
| 1983-07-13 | Finished Drilling |
| 1983-07-13 | Well Mode changed to Drilled and Cased |
| 1983-07-14 | Production Casing Operation Performed |
| 1983-08-10 | Perforation Treatment Performed - Jet Perforation |
| 1983-08-12 | Perforation Treatment Performed - Fractured |
| 1984-08-27 | Well Began Production |
| 1984-08-27 | Well Fluid changed to Gas |
| 1984-08-27 | Well Mode changed to Flowing |
| 1994-08-12 | Well Fluid changed to Gas |
| 1994-08-12 | Well Mode changed to Suspended |
| 1994-08-13 | Perforation Treatment Performed - Jet Perforation |
| 1994-08-14 | Well Fluid changed to Gas |
| 1994-08-14 | Well Mode changed to Suspended |
| 1996-09-29 | Well Log Performed |
| 1996-10-26 | Perforation Treatment Performed - Jet Perforation |
| 1996-11-05 | Perforation Treatment Performed - Fractured |
| 1996-11-10 | Perforation Treatment Performed - Jet Perforation |
| 1996-11-12 | Perforation Treatment Performed - Fractured |
| 2003-06-17 | Perforation Treatment Performed - Jet Perforation |
| 2003-07-01 | Perforation Treatment Performed - Fractured |
| 2003-11-12 | Perforation Treatment Performed - Jet Perforation |
| 2009-11-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-11-25 | Plug Back Performed |
| 2009-11-25 | Well Fluid changed to Gas |
| 2009-11-25 | Well Log Performed |
| 2009-11-25 | Well Mode changed to Abandoned Zone |
| 2009-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-11-26 | Plug Back Performed |
| 2009-11-26 | Well Log Performed |
| 2009-11-27 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1983-08-10 | Perforation | 768.00 | 770.50 | 11 |
| 1996-11-10 | Perforation | 512.00 | 515.00 | 7 |
| 1996-11-12 | Fracture | 512.00 | 521.00 | 0 |
| 2003-06-17 | Perforation | 464.00 | 466.00 | 13 |
| 2003-07-01 | Fracture | 464.00 | 466.00 | 0 |
| 2003-11-12 | Perforation | 337.00 | 341.00 | 13 |
| 2003-11-12 | Perforation | 329.50 | 334.00 | 13 |
| 2009-11-25 | Packing Device Capped w/Cement | 747.50 | 755.50 | 0 |
| 2009-11-25 | Packing Device Capped w/Cement | 572.00 | 580.00 | 0 |
| 2009-11-26 | Packing Device Capped w/Cement | 452.00 | 460.00 | 0 |
| 2009-11-26 | Packing Device Capped w/Cement | 318.00 | 325.00 | 0 |
| 1983-08-10 | Perforation | 771.50 | 772.50 | 11 |
| 1983-08-12 | Fracture | 768.00 | 772.50 | 0 |
| 1994-08-13 | Perforation | 581.50 | 586.00 | 7 |
| 1994-08-13 | Perforation | 592.00 | 601.00 | 7 |
| 1996-10-26 | Perforation | 541.00 | 544.00 | 13 |
| 1996-10-26 | Perforation | 531.00 | 534.00 | 13 |
| 1996-11-05 | Fracture | 531.00 | 544.00 | 0 |
| 1996-11-10 | Perforation | 518.00 | 521.00 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 1919 | 0.0 | 0.0 | 0.0 |
| 1985 | 4435 | 0.0 | 0.0 | 0.0 |
| 1986 | 5049 | 0.0 | 0.0 | 0.0 |
| 1987 | 6475 | 0.0 | 0.0 | 0.0 |
| 1988 | 7149 | 0.0 | 0.0 | 0.0 |
| 1989 | 1734 | 0.0 | 0.0 | 0.0 |
| 1990 | 2921 | 0.0 | 0.0 | 0.0 |
| 1991 | 4909 | 0.0 | 0.0 | 0.0 |
| 1992 | 6781 | 0.0 | 0.0 | 0.0 |
| 1993 | 8543 | 0.0 | 0.0 | 0.0 |
| 1994 | 5073 | 0.0 | 0.0 | 0.0 |
For data sources see[5]