If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234210712003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.945372,"lon":-112.932342,"icon":""}]} |
Location: 00/12-07-023-21W4/3 | |
Location Alias: 00/12-07-23-21 W4M | |
Location Alias 2: 00/12-07-023-21 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 21 | |
Section: 07 | |
County/Municipality: Wheatland County | |
Well Name: PCE PCR GLEICHEN 12-7-23-21 | |
Operator Name: Lynx Energy ULC | |
License Number: 0266978 | |
License Date: 2002-01-31 | |
License Status: Issued | |
Spud Date: 2002-02-03 | |
Final Drill Date: 2002-02-15 | |
Well Total Depth: 1529.00 m | |
Surface Hole Latitude: 50.945372 | |
Surface Hole Longitude: -112.932342 |
Date | Event |
---|---|
2002-01-31 | Obtained License |
2002-02-03 | Surface Casing Operation Performed |
2002-02-15 | Finished Drilling |
2002-02-15 | Well Log Performed |
2002-02-15 | Well Mode changed to Drilled and Cased |
2002-02-16 | Production Casing Operation Performed |
2002-02-16 | Rig Released |
2002-03-04 | Perforation Treatment Performed - Jet Perforation |
2002-03-04 | Well Log Performed |
2002-03-31 | Perforation Treatment Performed - Jet Perforation |
2002-03-31 | Well Log Performed |
2002-04-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-04-13 | Plug Back Performed |
2002-04-13 | Well Log Performed |
2002-05-06 | Perforation Treatment Performed - Jet Perforation |
2002-05-06 | Well Log Performed |
2002-06-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-07 | Plug Back Performed |
2002-06-08 | Perforation Treatment Performed - Jet Perforation |
2002-06-08 | Well Log Performed |
2002-06-23 | Perforation Treatment Performed - Fractured |
2002-12-06 | Well Began Production |
2002-12-06 | Well Fluid changed to Gas |
2002-12-06 | Well Mode changed to Flowing |
2003-03-01 | Well Fluid changed to Gas |
2003-03-01 | Well Mode changed to Suspended |
2010-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-16 | Perforation Treatment Performed - Jet Perforation |
2010-06-16 | Plug Back Performed |
2010-06-16 | Well Fluid changed to Gas |
2010-06-16 | Well Log Performed |
2010-06-16 | Well Mode changed to Abandoned Zone |
2010-07-13 | Perforation Treatment Performed - Fractured |
2010-07-24 | Perforation Treatment Performed - Jet Perforation |
2010-07-24 | Well Log Performed |
2010-08-08 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-03-04 | Perforation | 1454.00 | 1456.00 | 17 |
2010-06-16 | Packing Device Capped w/Cement | 433.00 | 441.00 | 0 |
2010-06-16 | Perforation | 281.00 | 283.00 | 17 |
2010-07-13 | Fracture | 281.00 | 283.00 | 0 |
2010-07-24 | Perforation | 227.00 | 231.00 | 13 |
2010-08-08 | Fracture | 227.00 | 231.00 | 0 |
2002-03-04 | Perforation | 1450.00 | 1453.00 | 17 |
2002-03-31 | Perforation | 1457.00 | 1458.00 | 17 |
2002-04-13 | Packing Device Capped w/Cement | 1437.00 | 1445.00 | 0 |
2002-05-06 | Perforation | 542.50 | 544.50 | 13 |
2002-05-06 | Perforation | 538.00 | 540.00 | 13 |
2002-06-07 | Packing Device Capped w/Cement | 527.00 | 535.00 | 0 |
2002-06-08 | Perforation | 447.50 | 451.00 | 13 |
2002-06-23 | Fracture | 447.50 | 451.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 181 | 0.0 | 0.0 | 0.0 |
2003 | 612 | 0.0 | 0.0 | 0.0 |
For data sources see[5]