X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234192510000

Well Details

Well ID: 0234192510000
Loading map...
Location: 00/10-25-023-19W4/0
Location Alias: 00/10-25-23-19 W4M
Location Alias 2: 00/10-25-023-19 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 19
Section: 25
County/Municipality: Wheatland County
Well Name: CVE ET AL SP HUSSAR 10-25-23-19
Operator Name: Cenovus Energy Inc.
License Number: 0021876
License Date: 1961-12-28
License Status: RecExempt
Spud Date: 1961-12-29
Final Drill Date: 1962-01-05
Well Total Depth: 1388.10 m
Surface Hole Latitude: 50.988507
Surface Hole Longitude: -112.525340

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-12-28 Obtained License
1962-01-03 Drill Stem Test Performed
1962-01-05 Finished Drilling
1962-01-06 Drill Stem Test Performed
1962-01-07 Drill Stem Test Performed
1962-01-07 Production Casing Operation Performed
1962-01-15 Well Mode changed to Drilled and Cased
1978-01-19 Perforation Treatment Performed - Jet Perforation
1978-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-09 Plug Back Performed
2000-07-09 Well Log Performed
2000-07-09 Well Mode changed to Abandoned Zone
2000-07-10 Well Log Performed
2002-01-14 Perforation Treatment Performed - Jet Perforation
2002-01-15 Perforation Treatment Performed - Remedial Casing
2002-01-15 Well Log Performed
2002-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-16 Perforation Treatment Performed - Jet Perforation
2002-01-17 Perforation Treatment Performed - Cement Squeeze
2002-01-17 Well Log Performed
2002-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-18 Perforation Treatment Performed - Jet Perforation
2002-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-19 Perforation Treatment Performed - Cement Squeeze
2002-01-19 Well Log Performed
2002-04-16 Well Abandoned
2002-04-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-19 Perforation 1111.60 1112.80 13
2002-01-17 Cement Squeeze 620.00 666.00 0
2002-01-18 Packing Device Capped w/Cement 573.00 664.00 0
2002-01-18 Perforation 414.00 415.00 13
2002-01-19 Cement Squeeze 414.00 415.00 0
2002-01-19 Packing Device Capped w/Cement 354.00 430.00 0
1978-01-21 Acid Treatment 1111.60 1112.80 0
2000-07-09 Packing Device Capped w/Cement 1090.00 1098.00 0
2002-01-14 Perforation 790.00 791.00 13
2002-01-14 Perforation 740.00 741.00 13
2002-01-15 Remedial Casing Cementing 740.00 791.00 0
2002-01-16 Packing Device Capped w/Cement 693.00 789.00 0
2002-01-16 Perforation 665.00 666.00 13
2002-01-16 Perforation 620.00 621.00 13

For data sources see[4]



References