X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234190605002

Well Details

Well ID: 0234190605002
Loading map...
Location: 00/05-06-023-19W4/2
Location Alias: 00/05-06-23-19 W4M
Location Alias 2: 00/05-06-023-19 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 19
Section: 06
County/Municipality: Wheatland County
Well Name: BLACKSPUR COUNTESS 5-6-23-19
Operator Name: Blackspur Oil Corp.
License Number: 0270183
License Date: 2002-05-22
License Status: Suspension
Spud Date: 2002-05-28
Final Drill Date: 2002-05-31
Well Total Depth: 1391.00 m
Surface Hole Latitude: 50.927022
Surface Hole Longitude: -112.651884

For data sources see[1][2]

Well History

Date Event
2002-05-22 Obtained License
2002-05-29 Surface Casing Operation Performed
2002-05-30 Direction Drilling Operation Performed - Deviate
2002-05-31 Finished Drilling
2002-05-31 Well Log Performed
2002-05-31 Well Mode changed to Drilled and Cased
2002-06-01 Production Casing Operation Performed
2002-06-01 Rig Released
2002-06-01 Well Log Performed
2002-06-14 Perforation Treatment Performed - Jet Perforation
2002-06-14 Well Log Performed
2002-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-27 Perforation Treatment Performed - Jet Perforation
2002-06-27 Plug Back Performed
2002-06-27 Well Log Performed
2002-07-13 Perforation Treatment Performed - Fractured
2002-09-01 Well Began Production
2002-09-01 Well Fluid changed to Crude Oil
2002-09-01 Well Mode changed to Flowing
2011-11-20 Well Fluid changed to Crude Oil
2011-11-20 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-05-30 711.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-14 Perforation 1366.00 1369.00 17
2002-06-27 Packing Device Capped w/Cement 1352.00 1360.00 0
2002-06-27 Perforation 1334.00 1338.00 17
2002-06-27 Perforation 1325.50 1327.50 17
2002-07-13 Fracture 1325.50 1338.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2055 0.0 0.0 0.0
2003 8244 0.0 0.0 0.0
2004 8009 0.0 0.0 0.0
2005 8208 0.0 0.0 0.0
2006 7919 0.0 0.0 0.0
2007 8288 0.0 0.0 0.0
2008 6343 0.0 0.0 0.0
2009 2304 0.0 0.0 0.0

For data sources see[6]

References