If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234150206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.925255,"lon":-111.998919,"icon":""}]} |
Location: 00/06-02-023-15W4/0 | |
Location Alias: 00/06-02-23-15 W4M | |
Location Alias 2: 00/06-02-023-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 15 | |
Section: 02 | |
County/Municipality: County of Newell | |
Well Name: AMOCO CANPAR VERGER 6-2-23-15 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0039173 | |
License Date: 1970-11-17 | |
License Status: Abandoned | |
Spud Date: 1970-11-26 | |
Final Drill Date: 1970-12-03 | |
Well Total Depth: 1079.00 m | |
Surface Hole Latitude: 50.925255 | |
Surface Hole Longitude: -111.998919 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1970-11-17 | Obtained License |
1970-11-30 | Drill Stem Test Performed |
1970-12-02 | Drill Stem Test Performed |
1970-12-03 | Drill Stem Test Performed |
1970-12-03 | Finished Drilling |
1970-12-04 | Production Casing Operation Performed |
1971-01-14 | Well Mode changed to Drilled and Cased |
1971-05-14 | Perforation Treatment Performed - Jet Perforation |
1971-05-26 | Well Began Production |
1971-05-26 | Well Fluid changed to Crude Oil |
1971-05-26 | Well Mode changed to Flowing |
1971-08-03 | Well Fluid changed to Crude Oil |
1971-08-03 | Well Mode changed to Pumping |
1974-01-24 | Well Fluid changed to Crude Oil |
1974-01-24 | Well Mode changed to Suspended |
1974-05-09 | Perforation Treatment Performed - Cement Squeeze |
1974-05-11 | Perforation Treatment Performed - Jet Perforation |
1974-05-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
1974-06-01 | Well Fluid changed to Crude Oil |
1974-06-01 | Well Mode changed to Pumping |
1975-10-01 | Well Fluid changed to Crude Oil |
1975-10-01 | Well Mode changed to Suspended |
1976-05-15 | Well Fluid changed to Crude Oil |
1976-05-15 | Well Mode changed to Pumping |
1980-08-27 | Well Fluid changed to Crude Oil |
1980-08-27 | Well Mode changed to Suspended |
1993-08-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-08-04 | Plug Back Performed |
1993-08-04 | Well Fluid changed to Crude Oil |
1993-08-04 | Well Mode changed to Abandoned |
1993-08-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1971-05-14 | Perforation | 1054.00 | 1061.00 | 7 |
1974-05-09 | Cement Squeeze | 1053.70 | 1061.00 | 0 |
1974-05-11 | Perforation | 1057.40 | 1058.90 | 0 |
1974-05-13 | Acid Wash | 1057.40 | 1058.90 | 0 |
1993-08-04 | Packing Device Capped w/Cement | 1038.00 | 1046.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1971 | 4981 | 0.0 | 0.0 | 0.0 |
1972 | 2670 | 0.0 | 0.0 | 0.0 |
1974 | 1490 | 0.0 | 0.0 | 0.0 |
1975 | 186 | 0.0 | 0.0 | 0.0 |
1976 | 3895 | 0.0 | 0.0 | 0.0 |
1977 | 8026 | 0.0 | 0.0 | 0.0 |
1978 | 7802 | 0.0 | 0.0 | 0.0 |
1979 | 8753 | 0.0 | 0.0 | 0.0 |
1980 | 4230 | 0.0 | 0.0 | 0.0 |
For data sources see[5]