If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0225041607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.867518,"lon":-114.499979,"icon":""}]} |
Location: 00/07-16-022-04W5/0 | |
Location Alias: 00/07-16-22-04 W5M | |
Location Alias 2: 00/07-16-022-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 5 | |
Range: 04 | |
Section: 16 | |
County/Municipality: Foothills County | |
Well Name: LGY NORVAL 7-16-22-4 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0103440 | |
License Date: 1983-10-06 | |
License Status: Suspension | |
Spud Date: 1983-11-02 | |
Final Drill Date: 1984-01-27 | |
Well Total Depth: 3825.00 m | |
Surface Hole Latitude: 50.867518 | |
Surface Hole Longitude: -114.499979 |
Date | Event |
---|---|
1983-10-06 | Obtained License |
1983-11-02 | Direction Drilling Operation Performed - 98 |
1983-12-28 | Well Log Performed |
1983-12-29 | Well Log Performed |
1984-01-27 | Finished Drilling |
1984-01-27 | Well Mode changed to Drilled and Cased |
1984-01-28 | Well Log Performed |
1984-01-31 | Liner Casing Operation Performed |
1984-03-02 | Well Log Performed |
1984-03-19 | Well Log Performed |
1984-03-20 | Perforation Treatment Performed - Jet Perforation |
1984-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-03-22 | Plug Back Performed |
1984-03-22 | Well Log Performed |
1984-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-23 | Perforation Treatment Performed - Jet Perforation |
1984-03-24 | Well Log Performed |
1984-03-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-03-25 | Perforation Treatment Performed - Jet Perforation |
1984-03-25 | Plug Back Performed |
1984-03-26 | Well Log Performed |
1984-03-27 | Well Log Performed |
1984-03-28 | Perforation Treatment Performed - Cement Squeeze |
1984-03-28 | Perforation Treatment Performed - Jet Perforation |
1984-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-06-01 | Well Began Production |
1984-06-01 | Well Fluid changed to Gas |
1984-06-01 | Well Mode changed to Flowing |
1984-06-05 | Well Fluid changed to Gas |
1984-06-05 | Well Mode changed to Suspended |
1984-06-09 | Well Log Performed |
1984-06-10 | Perforation Treatment Performed - Jet Perforation |
1984-06-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1984-06-12 | Perforation Treatment Performed - Acid Wash - No Pressure |
1984-06-23 | Well Log Performed |
1984-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-01-27 | Perforation Treatment Performed - Jet Perforation |
1990-01-31 | Perforation Treatment Performed - Jet Perforation |
1990-02-01 | Perforation Treatment Performed - Jet Perforation |
1990-02-01 | Well Log Performed |
1990-02-03 | Perforation Treatment Performed - Jet Perforation |
1990-02-04 | Perforation Treatment Performed - Jet Perforation |
1990-02-05 | Perforation Treatment Performed - Chemical Squeeze |
1990-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-12-11 | Perforation Treatment Performed - Cement Squeeze |
1990-12-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-01-03 | Well Log Performed |
1991-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-01-30 | Perforation Treatment Performed - Fractured |
1991-09-04 | Well Fluid changed to Gas |
1991-09-04 | Well Mode changed to Flowing |
2008-11-18 | Well Log Performed |
2008-11-19 | Well Fluid changed to Gas |
2008-11-19 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1983-11-02 | 3003.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-03-20 | Perforation | 3652.50 | 3656.00 | 13 |
1984-03-28 | Perforation | 3549.00 | 3550.00 | 13 |
1984-03-28 | Perforation | 3554.00 | 3561.00 | 13 |
1984-03-30 | Acid Treatment | 3549.00 | 3561.00 | 0 |
1984-05-11 | Acid Treatment | 3549.00 | 3561.00 | 0 |
1984-06-10 | Perforation | 3532.50 | 3534.50 | 7 |
1984-06-10 | Perforation | 3527.00 | 3528.50 | 7 |
1984-06-10 | Perforation | 3522.50 | 3524.50 | 7 |
1984-06-10 | Perforation | 3516.00 | 3518.50 | 7 |
1984-06-10 | Perforation | 3512.00 | 3513.50 | 7 |
1984-06-11 | Acid Wash | 3522.50 | 3534.50 | 0 |
1984-03-21 | Acid Treatment | 3652.50 | 3656.00 | 0 |
1984-06-12 | Acid Wash | 3512.00 | 3518.50 | 0 |
1984-06-25 | Packing Device Capped w/Cement | 3487.00 | 3495.00 | 0 |
1990-01-27 | Perforation | 3512.00 | 3513.50 | 7 |
1990-01-27 | Perforation | 3516.00 | 3518.50 | 7 |
1990-01-27 | Perforation | 3522.50 | 3524.50 | 7 |
1990-01-27 | Perforation | 3527.00 | 3528.50 | 7 |
1990-01-27 | Perforation | 3532.50 | 3534.50 | 7 |
1990-01-31 | Perforation | 3549.00 | 3550.00 | 13 |
1990-01-31 | Perforation | 3554.00 | 3561.00 | 13 |
1990-02-01 | Perforation | 3552.00 | 3561.00 | 13 |
1984-03-22 | Packing Device Capped w/Cement | 3638.00 | 3646.00 | 0 |
1990-02-03 | Perforation | 3522.50 | 3539.00 | 13 |
1990-02-03 | Perforation | 3547.00 | 3550.00 | 13 |
1990-02-04 | Perforation | 3512.00 | 3515.00 | 13 |
1990-02-05 | Chemical Squeeze | 3512.00 | 3561.00 | 0 |
1990-02-13 | Acid Treatment | 3512.00 | 3561.00 | 0 |
1990-12-11 | Cement Squeeze | 3557.00 | 3561.00 | 0 |
1990-12-21 | Packing Device Capped w/Cement | 3546.00 | 3550.00 | 0 |
1991-01-16 | Packing Device Capped w/Cement | 3534.50 | 3546.00 | 0 |
1991-01-30 | Fracture | 3512.00 | 3534.50 | 0 |
1984-03-23 | Perforation | 3623.00 | 3626.50 | 13 |
1984-03-23 | Acid Treatment | 3623.00 | 3626.50 | 0 |
1984-03-25 | Packing Device Capped w/Cement | 3612.00 | 3620.00 | 0 |
1984-03-25 | Perforation | 3570.00 | 3577.50 | 13 |
1984-03-25 | Acid Treatment | 3570.00 | 3577.50 | 0 |
1984-03-28 | Cement Squeeze | 3568.00 | 3568.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 99 | 0.0 | 0.0 | 0.0 |
1991 | 2465 | 0.0 | 0.0 | 0.0 |
1992 | 7952 | 0.0 | 0.0 | 0.0 |
1993 | 1879 | 0.0 | 0.0 | 0.0 |
1994 | 5849 | 0.0 | 0.0 | 0.0 |
1995 | 8626 | 0.0 | 0.0 | 0.0 |
1996 | 7764 | 0.0 | 0.0 | 0.0 |
1997 | 8673 | 0.0 | 0.0 | 0.0 |
1998 | 7466 | 0.0 | 0.0 | 0.0 |
1999 | 7452 | 0.0 | 0.0 | 0.0 |
2000 | 8415 | 0.0 | 0.0 | 0.0 |
2001 | 7125 | 0.0 | 0.0 | 0.0 |
2002 | 7977 | 0.0 | 0.0 | 0.0 |
2003 | 8218 | 0.0 | 0.0 | 0.0 |
2004 | 7798 | 0.0 | 0.0 | 0.0 |
2005 | 7271 | 0.0 | 0.0 | 0.0 |
2006 | 7462 | 0.0 | 0.0 | 0.0 |
For data sources see[6]