X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224273304000

Well Details

Well ID: 0224273304000
Loading map...
Location: 00/04-33-022-27W4/0
Location Alias: 00/04-33-22-27 W4M
Location Alias 2: 00/04-33-022-27 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 27
Section: 33
County/Municipality: Rocky View County
Well Name: COMPTON DALEMEAD 4-33-22-27
Operator Name: Lexin Resources Ltd.
License Number: 0236455
License Date: 2000-04-25
License Status: Issued
Spud Date: 2000-04-30
Final Drill Date: 2000-05-08
Well Total Depth: 2010.00 m
Surface Hole Latitude: 50.910013
Surface Hole Longitude: -113.696845

For data sources see[1][2]

Well History

Date Event
2000-04-25 Obtained License
2000-05-02 Surface Casing Operation Performed
2000-05-08 Finished Drilling
2000-05-09 Well Log Performed
2000-05-10 Drill Stem Test Performed
2000-05-11 Production Casing Operation Performed
2000-05-11 Rig Released
2000-05-11 Well Mode changed to Drilled and Cased
2000-05-17 Perforation Treatment Performed - Jet Perforation
2000-05-17 Well Log Performed
2000-07-03 Perforation Treatment Performed - Jet Perforation
2000-07-03 Well Log Performed
2000-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-18 Well Began Production
2001-12-18 Well Fluid changed to Gas
2001-12-18 Well Mode changed to Flowing
2002-10-30 Perforation Treatment Performed - Jet Perforation
2002-10-30 Well Log Performed
2002-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-06 Perforation Treatment Performed - Jet Perforation
2014-03-01 Well Fluid changed to Gas
2014-03-01 Well Mode changed to Suspended
2014-06-02 Well Fluid changed to Gas
2014-06-02 Well Mode changed to Flowing
2019-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-19 Perforation Treatment Performed - Cement Squeeze
2019-07-19 Plug Back Performed
2019-07-19 Well Fluid changed to Gas
2019-07-19 Well Mode changed to Abandoned Zone
2019-07-24 Well Log Performed
2019-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-08-20 Perforation Treatment Performed - Cement Squeeze
2019-08-20 Perforation Treatment Performed - Jet Perforation
2019-08-20 Plug Back Performed
2019-08-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-05-17 Perforation 1953.00 1954.00 17
2019-07-19 Cement Squeeze 1657.00 1659.00 0
2019-07-19 Packing Device Capped w/Cement 1553.00 1652.00 0
2019-08-20 Perforation 823.50 825.50 17
2019-08-20 Cement Squeeze 823.50 825.50 0
2019-08-20 Packing Device Capped w/Cement 805.00 821.00 0
2000-05-17 Perforation 1949.50 1951.50 17
2000-07-03 Perforation 1965.00 1967.00 17
2000-07-03 Perforation 1955.00 1956.00 17
2000-07-04 Acid Treatment 1949.50 1967.00 0
2002-10-30 Perforation 1958.00 1960.00 17
2002-10-31 Acid Treatment 1949.50 1967.00 0
2002-11-06 Perforation 1657.00 1659.00 17
2019-07-19 Packing Device Capped w/Cement 1929.00 1937.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 243 0.0 0.0 0.0
2002 4869 0.0 0.0 0.0
2003 5589 0.0 0.0 0.0
2004 7153 0.0 0.0 0.0
2005 8624 0.0 0.0 0.0
2006 8185 0.0 0.0 0.0
2007 8096 0.0 0.0 0.0
2008 8596 0.0 0.0 0.0
2009 8637 0.0 0.0 0.0
2010 8309 0.0 0.0 0.0
2011 6979 0.0 0.0 0.0
2012 8427 0.0 0.0 0.0
2013 2949 0.0 0.0 0.0
2014 4906 0.0 0.0 0.0
2015 5373 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References