If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0224263012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.903255,"lon":-113.607262,"icon":""}]} |
| Location: 00/12-30-022-26W4/0 | |
| Location Alias: 00/12-30-22-26 W4M | |
| Location Alias 2: 00/12-30-022-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 022 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 30 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 12-30-22-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0394086 | |
| License Date: 2008-02-13 | |
| License Status: Amended | |
| Spud Date: 2008-09-27 | |
| Final Drill Date: 2008-09-28 | |
| Well Total Depth: 1102.00 m | |
| Surface Hole Latitude: 50.903255 | |
| Surface Hole Longitude: -113.607262 |
| Date | Event |
|---|---|
| 2008-02-13 | Obtained License |
| 2008-09-27 | Direction Drilling Operation Performed - Deviate |
| 2008-09-27 | Surface Casing Operation Performed |
| 2008-09-28 | Finished Drilling |
| 2008-09-28 | Production Casing Operation Performed |
| 2008-09-28 | Well Mode changed to Drilled and Cased |
| 2008-09-29 | Rig Released |
| 2008-11-03 | Perforation Treatment Performed - Jet Perforation |
| 2008-11-15 | Perforation Treatment Performed - Fractured |
| 2008-11-20 | Well Fluid changed to Gas |
| 2008-11-20 | Well Mode changed to Testing |
| 2009-01-06 | Well Began Production |
| 2009-01-06 | Well Fluid changed to Gas |
| 2009-01-06 | Well Mode changed to Flowing |
| 2010-08-28 | Perforation Treatment Performed - Jet Perforation |
| 2010-09-02 | Perforation Treatment Performed - Fractured |
| 2010-09-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-09-10 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2008-09-27 | 4.20 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-11-03 | Perforation | 950.00 | 953.00 | 13 |
| 2010-08-28 | Perforation | 388.00 | 389.00 | 13 |
| 2010-08-28 | Perforation | 385.30 | 386.30 | 13 |
| 2010-08-28 | Perforation | 541.10 | 543.10 | 13 |
| 2010-08-28 | Perforation | 465.30 | 465.80 | 13 |
| 2010-08-28 | Perforation | 409.50 | 410.00 | 13 |
| 2010-08-28 | Perforation | 585.00 | 586.00 | 13 |
| 2010-08-28 | Perforation | 260.00 | 263.00 | 13 |
| 2010-08-28 | Perforation | 682.00 | 684.00 | 13 |
| 2010-08-28 | Perforation | 278.00 | 281.00 | 13 |
| 2010-08-28 | Perforation | 813.00 | 816.00 | 13 |
| 2008-11-15 | Fracture | 950.00 | 953.00 | 0 |
| 2010-08-28 | Perforation | 697.00 | 700.00 | 13 |
| 2010-08-28 | Perforation | 679.00 | 680.00 | 13 |
| 2010-08-28 | Perforation | 623.50 | 624.50 | 13 |
| 2010-08-28 | Perforation | 601.00 | 603.00 | 13 |
| 2010-08-28 | Perforation | 596.00 | 598.00 | 13 |
| 2010-08-28 | Perforation | 667.00 | 668.00 | 13 |
| 2010-08-28 | Perforation | 649.50 | 651.50 | 13 |
| 2010-09-02 | Fracture | 385.30 | 684.00 | 0 |
| 2010-09-02 | Fracture | 260.00 | 816.00 | 0 |
| 2010-08-28 | Perforation | 568.00 | 568.50 | 13 |
| 2010-08-28 | Perforation | 555.00 | 556.00 | 13 |
| 2010-08-28 | Perforation | 548.00 | 551.00 | 13 |
| 2010-08-28 | Perforation | 583.70 | 584.70 | 13 |
| 2010-08-28 | Perforation | 582.50 | 583.50 | 13 |
| 2010-08-28 | Perforation | 572.00 | 573.00 | 13 |
| 2010-08-28 | Perforation | 392.50 | 393.00 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 48 | 0.0 | 0.0 | 0.0 |
| 2009 | 8621 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8758 | 0.0 | 0.0 | 0.0 |
| 2012 | 5541 | 0.0 | 0.0 | 0.0 |
| 2013 | 8740 | 0.0 | 0.0 | 0.0 |
| 2014 | 8722 | 0.0 | 0.0 | 0.0 |
| 2015 | 8745 | 0.0 | 0.0 | 0.0 |
| 2016 | 8718 | 0.0 | 0.0 | 0.0 |
| 2017 | 8733 | 0.0 | 0.0 | 0.0 |
| 2018 | 8693 | 0.0 | 0.0 | 0.0 |
| 2019 | 8716 | 0.0 | 0.0 | 0.0 |
| 2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[6]