If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0224262103022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.879981,"lon":-113.562715,"icon":""}]} |
| Location: 02/03-21-022-26W4/2 | |
| Location Alias: 02/03-21-22-26 W4M | |
| Location Alias 2: 02/03-21-022-26 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 022 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 21 | |
| County/Municipality: Wheatland County | |
| Well Name: PERSIST OIL ENTICE 3-21-22-26 | |
| Operator Name: Persist Oil And Gas Inc. | |
| License Number: 0424767 | |
| License Date: 2010-10-19 | |
| License Status: Issued | |
| Spud Date: 2010-11-25 | |
| Final Drill Date: 2010-11-27 | |
| Well Total Depth: 1094.00 m | |
| Surface Hole Latitude: 50.879981 | |
| Surface Hole Longitude: -113.562715 |
| Date | Event |
|---|---|
| 2010-10-19 | Obtained License |
| 2010-11-25 | Direction Drilling Operation Performed - Deviate |
| 2010-11-26 | Surface Casing Operation Performed |
| 2010-11-27 | Finished Drilling |
| 2010-11-27 | Production Casing Operation Performed |
| 2010-11-27 | Rig Released |
| 2010-11-27 | Well Mode changed to Drilled and Cased |
| 2010-11-30 | Well Log Performed |
| 2010-12-18 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-14 | Perforation Treatment Performed - Fractured |
| 2011-01-30 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-05 | Perforation Treatment Performed - Fractured |
| 2011-02-12 | Well Began Production |
| 2011-02-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-12 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-11-25 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-12-18 | Perforation | 717.50 | 719.50 | 13 |
| 2011-01-30 | Perforation | 639.30 | 639.80 | 13 |
| 2011-01-30 | Perforation | 631.30 | 632.30 | 13 |
| 2011-01-30 | Perforation | 448.00 | 448.50 | 13 |
| 2011-01-30 | Perforation | 567.50 | 569.50 | 13 |
| 2011-01-30 | Perforation | 517.00 | 518.50 | 13 |
| 2011-01-30 | Perforation | 456.00 | 458.00 | 13 |
| 2011-01-30 | Perforation | 428.40 | 428.90 | 13 |
| 2011-01-30 | Perforation | 443.20 | 443.70 | 13 |
| 2011-01-30 | Perforation | 431.60 | 432.10 | 13 |
| 2011-01-30 | Perforation | 430.50 | 431.00 | 13 |
| 2010-12-18 | Perforation | 592.50 | 594.50 | 13 |
| 2011-01-30 | Perforation | 650.70 | 651.20 | 13 |
| 2011-01-30 | Perforation | 815.40 | 815.90 | 13 |
| 2011-01-30 | Perforation | 809.20 | 810.20 | 13 |
| 2011-01-30 | Perforation | 791.10 | 792.10 | 13 |
| 2011-01-30 | Perforation | 828.40 | 830.40 | 13 |
| 2011-01-30 | Perforation | 900.00 | 900.50 | 13 |
| 2011-01-30 | Perforation | 886.10 | 886.60 | 13 |
| 2011-01-30 | Perforation | 832.00 | 833.00 | 13 |
| 2011-01-30 | Perforation | 787.40 | 788.40 | 13 |
| 2011-01-30 | Perforation | 683.20 | 683.70 | 13 |
| 2011-01-14 | Fracture | 717.50 | 719.50 | 0 |
| 2011-01-30 | Perforation | 671.70 | 672.70 | 13 |
| 2011-01-30 | Perforation | 669.10 | 669.60 | 13 |
| 2011-01-30 | Perforation | 685.20 | 685.70 | 13 |
| 2011-01-30 | Perforation | 698.10 | 700.10 | 13 |
| 2011-01-30 | Perforation | 705.20 | 705.70 | 13 |
| 2011-01-30 | Perforation | 688.00 | 688.50 | 13 |
| 2011-02-05 | Fracture | 456.00 | 569.50 | 0 |
| 2011-02-05 | Fracture | 428.40 | 900.50 | 0 |
| 2011-01-14 | Fracture | 592.50 | 594.50 | 0 |
| 2011-01-30 | Perforation | 607.20 | 609.20 | 13 |
| 2011-01-30 | Perforation | 582.60 | 583.10 | 13 |
| 2011-01-30 | Perforation | 464.80 | 465.80 | 13 |
| 2011-01-30 | Perforation | 611.60 | 612.60 | 13 |
| 2011-01-30 | Perforation | 640.70 | 641.70 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7746 | 0.0 | 0.0 | 0.0 |
| 2012 | 4878 | 0.0 | 0.0 | 0.0 |
| 2013 | 8602 | 0.0 | 0.0 | 0.0 |
| 2014 | 8650 | 0.0 | 0.0 | 0.0 |
| 2015 | 8704 | 0.0 | 0.0 | 0.0 |
| 2016 | 8735 | 0.0 | 0.0 | 0.0 |
| 2017 | 8570 | 0.0 | 0.0 | 0.0 |
| 2018 | 8678 | 0.0 | 0.0 | 0.0 |
| 2019 | 8748 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]