X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224261208020

Well Details

Well ID: 0224261208020
Loading map...
Location: 02/08-12-022-26W4/0
Location Alias: 02/08-12-22-26 W4M
Location Alias 2: 02/08-12-022-26 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 26
Section: 12
County/Municipality: Wheatland County
Well Name: ANTERRA ENTICE 8-12-22-26
Operator Name: Anterra Energy Inc.
License Number: 0143388
License Date: 1990-02-22
License Status: Suspension
Spud Date: 1990-03-24
Final Drill Date: 1990-04-09
Well Total Depth: 2004.00 m
Surface Hole Latitude: 50.855772
Surface Hole Longitude: -113.463380

For data sources see[1][2]

Well History

Date Event
1990-02-22 Obtained License
1990-03-25 Surface Casing Operation Performed
1990-03-27 Direction Drilling Operation Performed - Deviate
1990-04-09 Finished Drilling
1990-04-09 Well Mode changed to Drilled and Cased
1990-04-10 Well Log Performed
1990-04-12 Production Casing Operation Performed
1990-04-12 Rig Released
1990-06-21 Well Log Performed
1990-06-22 Well Log Performed
1990-06-23 Perforation Treatment Performed - Jet Perforation
1990-07-12 Well Began Production
1990-07-12 Well Fluid changed to Crude Oil
1990-07-12 Well Mode changed to Flowing
1990-08-01 Well Log Performed
1990-08-30 Well Fluid changed to Crude Oil
1990-08-30 Well Mode changed to Pumping
1995-02-25 Perforation Treatment Performed - Jet Perforation
1995-08-31 Well Log Performed
1996-01-03 Well Fluid changed to Crude Oil
1996-01-03 Well Mode changed to Suspended
1999-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-23 Plug Back Performed
1999-06-23 Well Fluid changed to Crude Oil
1999-06-23 Well Mode changed to Abandoned Zone
1999-06-24 Well Log Performed
1999-09-16 Perforation Treatment Performed - Jet Perforation
2000-12-18 Perforation Treatment Performed - Fractured
2001-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-01 Plug Back Performed
2001-10-02 Well Log Performed
2001-10-05 Well Log Performed
2007-11-30 Well Log Performed
2009-08-28 Perforation Treatment Performed - Jet Perforation
2009-08-29 Perforation Treatment Performed - Cement Squeeze
2009-08-29 Plug Back Performed
2009-08-29 Well Log Performed
2009-09-07 Perforation Treatment Performed - Jet Perforation
2009-09-07 Well Log Performed
2010-09-06 Perforation Treatment Performed - Jet Perforation
2010-09-11 Perforation Treatment Performed - Fractured
2011-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-11-06 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-03-27 930.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-06-23 Perforation 1956.00 1958.50 16
2009-08-29 Cement Squeeze 886.00 895.50 0
2009-09-07 Perforation 1940.00 1942.00 17
2009-09-07 Perforation 1938.00 1939.00 17
2010-09-06 Perforation 1938.00 1939.00 20
2010-09-06 Perforation 1940.00 1942.00 20
2010-09-11 Fracture 1938.00 1942.00 0
2011-02-17 Acid Treatment 1938.00 1942.00 0
1995-02-25 Perforation 1956.00 1958.50 18
1999-06-23 Packing Device Capped w/Cement 1938.00 1946.00 0
1999-09-16 Perforation 892.50 895.50 13
1999-09-16 Perforation 886.00 891.00 13
2000-12-18 Fracture 886.00 895.50 0
2001-10-01 Packing Device Capped w/Cement 872.00 880.00 0
2009-08-28 Perforation 892.50 895.50 17
2009-08-28 Perforation 886.00 891.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2461 0.0 0.0 0.0
1991 6987 0.0 0.0 0.0
1992 4619 0.0 0.0 0.0
1993 6900 0.0 0.0 0.0
1994 8038 0.0 0.0 0.0
1995 7845 0.0 0.0 0.0
1996 50 0.0 0.0 0.0

For data sources see[6]

References