X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224260101003

Well Details

Well ID: 0224260101003
Loading map...
Location: 00/01-01-022-26W4/3
Location Alias: 00/01-01-22-26 W4M
Location Alias 2: 00/01-01-022-26 W4/03
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 26
Section: 01
County/Municipality: Wheatland County
Well Name: PERSIST OIL ENTICE 4-6-22-25
Operator Name: Persist Oil And Gas Inc.
License Number: 0137128
License Date: 1988-10-24
License Status: Amended
Spud Date: 1988-11-19
Final Drill Date: 1997-06-30
Well Total Depth: 2036.00 m
Surface Hole Latitude: 50.837508
Surface Hole Longitude: -113.466379

For data sources see[1][2]

Well History

Date Event
1988-10-24 Obtained License
1988-11-21 Surface Casing Operation Performed
1988-12-01 Intermediate Casing Operation Performed
1997-06-17 Direction Drilling Operation Performed - Horizontal
1997-06-20 Direction Drilling Operation Performed - Horizontal
1997-06-30 Finished Drilling
1997-06-30 Perforation Treatment Performed - Open-Hole Completion
1997-06-30 Well Log Performed
1997-06-30 Well Mode changed to Drilled and Cased
1997-07-03 Well Log Performed
1997-08-06 Liner Casing Operation Performed
1997-08-11 Rig Released
1997-09-20 Well Began Production
1997-09-20 Well Fluid changed to Crude Oil
1997-09-20 Well Mode changed to Pumping
1999-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-10 Plug Back Performed
1999-04-10 Well Fluid changed to Crude Oil
1999-04-10 Well Mode changed to Abandoned Zone
1999-04-11 Well Log Performed
1999-04-18 Perforation Treatment Performed - Jet Perforation
1999-04-19 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-17 1761.00 Horizontal
1997-06-20 1836.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-30 Open Hole/Barefoot Completion 1758.10 2036.00 0
1999-04-10 Packing Device Capped w/Cement 1745.00 1753.00 0
1999-04-18 Perforation 873.00 880.00 7
1999-04-19 Fracture 873.00 880.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2200 0.0 0.0 0.0
1998 3374 0.0 0.0 0.0

For data sources see[6]

References