X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224233113002

Well Details

Well ID: 0224233113002
Loading map...
Location: 00/13-31-022-23W4/2
Location Alias: 00/13-31-22-23 W4M
Location Alias 2: 00/13-31-022-23 W4/02
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 23
Section: 31
County/Municipality: Siksika 146
Well Name: OUTPOST BLACKFT 13-31-22-23
Operator Name: Outpost Energy Ltd.
License Number: 0266270
License Date: 2002-01-21
License Status: Issued
Spud Date: 2002-02-07
Final Drill Date: 2002-02-13
Well Total Depth: 1624.00 m
Surface Hole Latitude: 50.921040
Surface Hole Longitude: -113.186355

For data sources see[1][2]

Well History

Date Event
2002-01-21 Obtained License
2002-02-08 Surface Casing Operation Performed
2002-02-13 Finished Drilling
2002-02-13 Well Mode changed to Drilled and Cased
2002-02-14 Well Log Performed
2002-02-15 Production Casing Operation Performed
2002-02-15 Rig Released
2002-03-13 Perforation Treatment Performed - Jet Perforation
2002-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-16 Perforation Treatment Performed - Jet Perforation
2002-03-16 Plug Back Performed
2002-03-19 Perforation Treatment Performed - Jet Perforation
2002-03-22 Perforation Treatment Performed - Fractured
2002-03-24 Perforation Treatment Performed - Cement Squeeze
2002-03-24 Plug Back Performed
2002-03-26 Perforation Treatment Performed - Jet Perforation
2002-03-27 Perforation Treatment Performed - Cement Squeeze
2002-03-27 Plug Back Performed
2002-04-01 Perforation Treatment Performed - Jet Perforation
2002-05-01 Well Began Production
2002-05-01 Well Fluid changed to Gas
2002-05-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-13 Perforation 1550.00 1552.00 17
2002-03-16 Packing Device Capped w/Cement 1535.00 1543.50 0
2002-03-16 Perforation 1326.00 1334.00 17
2002-03-19 Perforation 539.00 551.00 17
2002-03-22 Fracture 539.00 551.00 0
2002-03-24 Cement Squeeze 539.00 551.00 0
2002-03-26 Perforation 325.00 327.00 17
2002-03-27 Cement Squeeze 325.00 327.00 0
2002-04-01 Perforation 327.00 330.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 4875 0.0 0.0 0.0
2003 8462 0.0 0.0 0.0
2004 8594 0.0 0.0 0.0
2005 8526 0.0 0.0 0.0
2006 8603 0.0 0.0 0.0
2007 8300 0.0 0.0 0.0
2008 7700 0.0 0.0 0.0
2009 6830 0.0 0.0 0.0
2010 7392 0.0 0.0 0.0
2011 5400 0.0 0.0 0.0
2012 8351 0.0 0.0 0.0
2013 8495 0.0 0.0 0.0
2014 8088 0.0 0.0 0.0
2015 7247 0.0 0.0 0.0
2016 7659 0.0 0.0 0.0
2017 8131 0.0 0.0 0.0
2018 7303 0.0 0.0 0.0
2019 8712 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References