X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224092311000

Well Details

Well ID: 0224092311000
Loading map...
Location: 00/11-23-022-09W4/0
Location Alias: 00/11-23-22-09 W4M
Location Alias 2: 00/11-23-022-09 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 09
Section: 23
County/Municipality: Special Areas No. 3
Well Name: FINA DYNAMIC JENNER 11-23-22-9
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0019048
License Date: 1960-03-17
License Status: Re-Entered
Spud Date: 1960-05-18
Final Drill Date: 1960-05-31
Well Total Depth: 974.80 m
Surface Hole Latitude: 50.887458
Surface Hole Longitude: -111.149450

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-03-17 Obtained License
1960-05-24 Drill Stem Test Performed
1960-05-25 Drill Stem Test Performed
1960-05-28 Drill Stem Test Performed
1960-05-29 Drill Stem Test Performed
1960-05-31 Finished Drilling
1960-06-01 Production Casing Operation Performed
1960-06-27 Perforation Treatment Performed - Bullet Perforation
1960-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-08 Perforation Treatment Performed - Cement Squeeze
1960-07-23 Perforation Treatment Performed - Bullet Perforation
1961-02-07 Well Mode changed to Drilled and Cased
1964-09-01 Well Fluid changed to Crude Oil
1964-09-01 Well Mode changed to Potential
1969-07-28 Perforation Treatment Performed - Cement Plug
1969-07-29 Well Abandoned
1969-07-29 Well Fluid changed to Crude Oil
1969-07-29 Well Mode changed to Abandoned and Re-entered
1989-09-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-06-27 Bullet Perforation 916.20 918.70 7
1960-07-01 Acid Treatment 916.20 918.70 0
1960-07-08 Cement Squeeze 916.20 918.70 0
1960-07-23 Bullet Perforation 915.60 917.80 7
1969-07-28 Cement Plug 883.90 923.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References