X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224091614002

Well Details

Well ID: 0224091614002
Loading map...
Location: 00/14-16-022-09W4/2
Location Alias: 00/14-16-22-09 W4M
Location Alias 2: 00/14-16-022-09 W4/02
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 09
Section: 16
County/Municipality: Special Areas No. 3
Well Name: CNRL JENNER 14-16-22-9
Operator Name: Canadian Natural Resources Limited
License Number: 0201071
License Date: 1997-05-08
License Status: Issued
Spud Date: 1997-06-17
Final Drill Date: 1997-06-20
Well Total Depth: 987.00 m
Surface Hole Latitude: 50.874892
Surface Hole Longitude: -111.196408

For data sources see[1][2]

Well History

Date Event
1997-05-08 Obtained License
1997-06-17 Lost Circulation Occurred
1997-06-18 Surface Casing Operation Performed
1997-06-20 Finished Drilling
1997-06-20 Well Log Performed
1997-06-20 Well Mode changed to Drilled and Cased
1997-06-21 Production Casing Operation Performed
1997-06-21 Rig Released
1997-06-26 Perforation Treatment Performed - Jet Perforation
1997-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-23 Perforation Treatment Performed - Jet Perforation
1997-08-23 Plug Back Performed
1998-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-11 Perforation Treatment Performed - Jet Perforation
1998-11-11 Plug Back Performed
1998-11-17 Well Began Production
1998-11-17 Well Fluid changed to Crude Oil
1998-11-17 Well Mode changed to Pumping
1999-08-04 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-26 Perforation 958.00 959.00 13
1997-08-23 Packing Device Capped w/Cement 953.50 956.50 0
1997-08-23 Perforation 950.50 952.00 13
1998-11-11 Packing Device Capped w/Cement 946.50 949.50 0
1998-11-11 Perforation 943.50 944.50 13
1999-08-04 Perforation 940.00 945.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1078 0.0 0.0 0.0
1999 8600 0.0 0.0 0.0
2000 8218 0.0 0.0 0.0
2001 8270 0.0 0.0 0.0
2002 4930 0.0 0.0 0.0
2003 8735 0.0 0.0 0.0
2004 8039 0.0 0.0 0.0
2005 5466 0.0 0.0 0.0
2006 6682 0.0 0.0 0.0
2007 7985 0.0 0.0 0.0
2008 8221 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8524 0.0 0.0 0.0
2011 8737 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8731 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8712 0.0 0.0 0.0
2016 8591 0.0 0.0 0.0
2017 6432 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-06-17 Lost Circulation 100.00 211.00

For data sources see[6]

References