X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224081611000

Well Details

Well ID: 0224081611000
Loading map...
Location: 00/11-16-022-08W4/0
Location Alias: 00/11-16-22-08 W4M
Location Alias 2: 00/11-16-022-08 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 08
Section: 16
County/Municipality: Special Areas No. 2
Well Name: CARDINAL ATL-BUFF 11-16-22-8
Operator Name: Cardinal Energy Ltd.
License Number: 0018312
License Date: 1959-12-14
License Status: Abandoned
Spud Date: 1959-12-12
Final Drill Date: 1959-12-22
Well Total Depth: 1055.20 m
Surface Hole Latitude: 50.872531
Surface Hole Longitude: -111.058215

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-12 Lost Circulation Occurred
1959-12-14 Obtained License
1959-12-17 Drill Stem Test Performed
1959-12-18 Drill Stem Test Performed
1959-12-19 Drill Stem Test Performed
1959-12-20 Drill Stem Test Performed
1959-12-21 Drill Stem Test Performed
1959-12-22 Finished Drilling
1959-12-23 Drill Stem Test Performed
1959-12-24 Production Casing Operation Performed
1960-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-07 Perforation Treatment Performed - Jet Perforation
1960-01-11 Well Mode changed to Drilled and Cased
1979-05-15 Well Began Production
1979-05-15 Well Fluid changed to Gas
1979-05-15 Well Mode changed to Flowing
1984-03-01 Well Fluid changed to Gas
1984-03-01 Well Mode changed to Suspended
1991-10-24 Well Log Performed
1991-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-25 Perforation Treatment Performed - Jet Perforation
1991-10-25 Perforation Treatment Performed - Selective Jet Perforations
1991-10-25 Plug Back Performed
1991-10-25 Well Fluid changed to Gas
1991-10-25 Well Mode changed to Abandoned Zone
1993-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-12-03 Plug Back Performed
1993-12-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-07 Perforation 890.60 892.10 7
1960-01-07 Perforation 887.90 889.10 7
1960-01-07 Acid Treatment 887.90 892.10 0
1991-10-25 Packing Device Capped w/Cement 862.00 870.00 0
1991-10-25 Selective Jet Perforations 314.00 314.00 1
1991-10-25 Perforation 313.50 316.50 13
1993-12-03 Packing Device Capped w/Cement 292.00 300.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1666 0.0 0.0 0.0
1980 8146 0.0 0.0 0.0
1981 677 0.0 0.0 0.0
1982 5192 0.0 0.0 0.0
1983 4340 0.0 0.0 0.0
1984 866 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1959-12-12 Lost Circulation 36.60 36.60

For data sources see[6]

References