X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0224062214000

Well Details

Well ID: 0224062214000
Loading map...
Location: 00/14-22-022-06W4/0
Location Alias: 00/14-22-22-06 W4M
Location Alias 2: 00/14-22-022-06 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 06
Section: 22
County/Municipality: Special Areas No. 3
Well Name: CITY OF MEDH BIND 14-22-22-6
Operator Name: City Of Medicine Hat
License Number: 0335431
License Date: 2005-07-27
License Status: Suspension
Spud Date: 2005-08-21
Final Drill Date: 2005-08-22
Well Total Depth: 505.00 m
Surface Hole Latitude: 50.891968
Surface Hole Longitude: -110.755510

For data sources see[1][2]

Well History

Date Event
2005-07-27 Obtained License
2005-08-21 Surface Casing Operation Performed
2005-08-22 Finished Drilling
2005-08-22 Production Casing Operation Performed
2005-08-22 Rig Released
2005-08-22 Well Mode changed to Drilled and Cased
2005-09-01 Well Log Performed
2005-10-04 Perforation Treatment Performed - Jet Perforation
2005-10-06 Perforation Treatment Performed - Fractured
2005-10-09 Perforation Treatment Performed - Jet Perforation
2005-10-10 Perforation Treatment Performed - Fractured
2005-10-13 Perforation Treatment Performed - Jet Perforation
2005-10-14 Perforation Treatment Performed - Fractured
2005-12-20 Well Began Production
2005-12-20 Well Fluid changed to Gas
2005-12-20 Well Mode changed to Flowing
2018-12-17 Well Fluid changed to Gas
2018-12-17 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-04 Perforation 444.00 447.00 13
2005-10-13 Perforation 362.00 363.00 7
2005-10-13 Perforation 365.00 370.00 7
2005-10-13 Perforation 373.00 375.00 7
2005-10-14 Fracture 359.00 361.00 0
2005-10-14 Fracture 362.00 363.00 0
2005-10-14 Fracture 365.00 370.00 0
2005-10-14 Fracture 373.00 375.00 0
2005-10-06 Fracture 444.00 447.00 0
2005-10-09 Perforation 386.00 389.00 7
2005-10-09 Perforation 391.50 392.50 7
2005-10-09 Perforation 396.00 398.00 7
2005-10-10 Fracture 386.00 389.00 0
2005-10-10 Fracture 391.50 392.50 0
2005-10-10 Fracture 396.00 398.00 0
2005-10-13 Perforation 359.00 361.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 264 0.0 0.0 0.0
2006 8147 0.0 0.0 0.0
2007 8685 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 8707 0.0 0.0 0.0
2010 2120 0.0 0.0 0.0
2011 4398 0.0 0.0 0.0
2012 8474 0.0 0.0 0.0
2013 4887 0.0 0.0 0.0
2014 4604 0.0 0.0 0.0
2016 5734 0.0 0.0 0.0
2017 7264 0.0 0.0 0.0
2018 720 0.0 0.0 0.0

For data sources see[5]

References