0215043409000

Well Details

Well ID: 0215043409000
Loading map...
Location: 00/09-34-021-04W5/0
Location Alias: 00/09-34-21-04 W5M
Location Alias 2: 00/09-34-021-04 W5/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 5
Range: 04
Section: 34
County/Municipality: Foothills County
Well Name: CALEDONIANMID TV 9-34-21-4
Operator Name: Caledonian Midstream Corporation
License Number: 0101348
License Date: 1983-05-16
License Status: Suspension
Spud Date: 1983-05-30
Final Drill Date: 1983-09-15
Well Total Depth: 3675.00 m
Surface Hole Latitude: 50.827946
Surface Hole Longitude: -114.472982

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-05-16 Obtained License
1983-05-30 Direction Drilling Operation Performed - 98
1983-05-30 Lost Circulation Occurred
1983-08-26 Drill Stem Test Performed
1983-09-07 Drill Stem Test Performed
1983-09-15 Finished Drilling
1983-09-20 Production Casing Operation Performed
1983-11-01 Well Log Performed
1983-11-02 Perforation Treatment Performed - Jet Perforation
1983-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-06 Well Log Performed
1983-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-11-07 Perforation Treatment Performed - Jet Perforation
1983-11-07 Plug Back Performed
1983-11-08 Well Log Performed
1983-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-11-09 Perforation Treatment Performed - Jet Perforation
1983-11-09 Plug Back Performed
1983-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-11-12 Perforation Treatment Performed - Jet Perforation
1983-11-12 Plug Back Performed
1983-11-14 Well Log Performed
1983-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-11-15 Plug Back Performed
1983-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-17 Perforation Treatment Performed - Jet Perforation
1984-11-11 Well Log Performed
1987-06-08 Well Mode changed to Drilled and Cased
1987-11-01 Well Began Production
1987-11-01 Well Fluid changed to Gas
1987-11-01 Well Mode changed to Flowing
1999-06-24 Perforation Treatment Performed - Jet Perforation
1999-06-26 Perforation Treatment Performed - Jet Perforation
1999-06-26 Well Log Performed
1999-07-05 Perforation Treatment Performed - Acid Wash - No Pressure
2008-11-25 Well Log Performed
2008-12-01 Well Fluid changed to Gas
2008-12-01 Well Log Performed
2008-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-05-30 639.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-02 Perforation 3558.00 3560.00 13
1983-11-09 Perforation 3437.00 3441.00 13
1983-11-09 Acid Treatment 3437.00 3441.00 0
1983-11-12 Packing Device Capped w/Cement 3428.00 3436.00 0
1983-11-12 Perforation 3420.50 3423.00 13
1983-11-12 Acid Treatment 3420.50 3423.00 0
1983-11-15 Packing Device Capped w/Cement 3411.00 3419.00 0
1983-11-17 Perforation 3390.00 3394.00 13
1983-11-17 Perforation 3373.00 3375.00 13
1983-11-17 Perforation 3378.00 3382.00 13
1983-11-17 Acid Treatment 3373.00 3394.00 0
1983-11-02 Perforation 3550.00 3552.00 13
1999-06-24 Perforation 3420.50 3423.00 13
1999-06-26 Perforation 3437.00 3441.00 13
1999-07-05 Acid Wash 3373.00 3441.00 0
1983-11-03 Acid Treatment 3550.00 3560.00 0
1983-11-04 Acid Treatment 3550.00 3560.00 0
1983-11-07 Packing Device Capped w/Cement 3538.00 3546.00 0
1983-11-07 Perforation 3501.00 3503.00 13
1983-11-07 Perforation 3496.50 3498.00 13
1983-11-07 Acid Treatment 3501.00 3503.00 0
1983-11-09 Packing Device Capped w/Cement 3482.00 3490.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 26 0.0 0.0 0.0
1987 1464 0.0 0.0 0.0
1988 8063 0.0 0.0 0.0
1989 8326 0.0 0.0 0.0
1990 8177 0.0 0.0 0.0
1991 6578 0.0 0.0 0.0
1992 7852 0.0 0.0 0.0
1993 2235 0.0 0.0 0.0
1994 6225 0.0 0.0 0.0
1995 8506 0.0 0.0 0.0
1996 7707 0.0 0.0 0.0
1997 8681 0.0 0.0 0.0
1998 7537 0.0 0.0 0.0
1999 6846 0.0 0.0 0.0
2000 8559 0.0 0.0 0.0
2001 6697 0.0 0.0 0.0
2002 8016 0.0 0.0 0.0
2003 8090 0.0 0.0 0.0
2004 6806 0.0 0.0 0.0
2005 5905 0.0 0.0 0.0
2006 7654 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-05-30 Lost Circulation 42.00 42.00

For data sources see[7]