X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214250806020

Well Details

Well ID: 0214250806020
Loading map...
Location: 02/06-08-021-25W4/0
Location Alias: 02/06-08-21-25 W4M
Location Alias 2: 02/06-08-021-25 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 25
Section: 08
County/Municipality: Vulcan County
Well Name: CYPRESS 102 HERRONTON 6-8-21-25
Operator Name: TAQA North Ltd.
License Number: 0247039
License Date: 2000-12-14
License Status: Amended
Spud Date: 2001-04-25
Final Drill Date: 2001-04-29
Well Total Depth: 746.00 m
Surface Hole Latitude: 50.768462
Surface Hole Longitude: -113.433387

For data sources see[1][2]

Well History

Date Event
2000-12-14 Obtained License
2001-04-26 Surface Casing Operation Performed
2001-04-29 Finished Drilling
2001-04-29 Production Casing Operation Performed
2001-04-29 Rig Released
2001-04-29 Well Mode changed to Drilled and Cased
2001-05-19 Perforation Treatment Performed - Jet Perforation
2001-05-19 Well Log Performed
2001-06-19 Perforation Treatment Performed - Fractured
2001-11-02 Well Began Production
2001-11-02 Well Fluid changed to Gas
2001-11-02 Well Mode changed to Flowing
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping
2005-09-30 Perforation Treatment Performed - Jet Perforation
2005-09-30 Well Log Performed
2005-10-05 Perforation Treatment Performed - Fractured
2005-10-06 Perforation Treatment Performed - Fractured
2006-02-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-05-19 Perforation 647.50 654.50 17
2005-09-30 Perforation 379.50 381.00 13
2005-09-30 Perforation 372.50 374.00 13
2005-09-30 Perforation 360.50 362.00 13
2005-09-30 Perforation 333.00 333.50 13
2005-09-30 Perforation 276.50 278.00 13
2005-09-30 Perforation 265.00 266.00 13
2005-09-30 Perforation 258.50 260.00 13
2005-09-30 Perforation 250.00 251.50 13
2005-10-05 Fracture 360.50 528.00 0
2005-10-06 Fracture 250.00 333.50 0
2001-06-19 Fracture 647.50 654.50 0
2005-09-30 Perforation 572.50 573.00 13
2005-09-30 Perforation 570.50 571.50 13
2005-09-30 Perforation 527.00 528.00 13
2005-09-30 Perforation 428.50 431.50 13
2005-09-30 Perforation 426.00 427.00 13
2005-09-30 Perforation 410.00 411.00 13
2005-09-30 Perforation 394.50 399.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1381 0.0 0.0 0.0
2002 8347 0.0 0.0 0.0
2003 8753 0.0 0.0 0.0
2004 8401 0.0 0.0 0.0
2005 5558 0.0 0.0 0.0
2006 6647 0.0 0.0 0.0
2007 8222 0.0 0.0 0.0
2008 8555 0.0 0.0 0.0
2009 7632 0.0 0.0 0.0
2010 8091 0.0 0.0 0.0
2011 7479 0.0 0.0 0.0
2012 8632 0.0 0.0 0.0
2013 8742 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8673 0.0 0.0 0.0
2016 8433 0.0 0.0 0.0
2017 8406 0.0 0.0 0.0
2018 8552 0.0 0.0 0.0
2019 8339 0.0 0.0 0.0
2020 1992 0.0 0.0 0.0

For data sources see[5]

References