If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0214242904002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/04-29-021-24W4/2 | |
Location Alias: 00/04-29-21-24 W4M | |
Location Alias 2: 00/04-29-021-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 021 | |
Meridian: 4 | |
Range: 24 | |
Section: 29 | |
County/Municipality: Vulcan County | |
Well Name: PRIMEWEST FARROW 4-29-21-24 | |
Operator Name: TAQA North Ltd. | |
License Number: 0270708 | |
License Date: 2002-06-07 | |
License Status: Issued | |
Spud Date: 2002-06-14 | |
Final Drill Date: 2002-06-17 | |
Well Total Depth: 1017.00 m | |
Surface Hole Latitude: 50.808277 | |
Surface Hole Longitude: -113.299898 |
Date | Event |
---|---|
2002-06-07 | Obtained License |
2002-06-15 | Surface Casing Operation Performed |
2002-06-17 | Finished Drilling |
2002-06-17 | Production Casing Operation Performed |
2002-06-17 | Rig Released |
2002-06-17 | Well Mode changed to Drilled and Cased |
2002-07-09 | Well Log Performed |
2002-12-12 | Perforation Treatment Performed - Jet Perforation |
2003-01-21 | Well Log Performed |
2003-01-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-01-22 | Perforation Treatment Performed - Jet Perforation |
2003-01-22 | Plug Back Performed |
2003-01-25 | Perforation Treatment Performed - Fractured |
2003-01-27 | Perforation Treatment Performed - Jet Perforation |
2003-01-27 | Well Log Performed |
2003-11-23 | Well Log Performed |
2003-11-24 | Perforation Treatment Performed - Cement Squeeze |
2003-11-27 | Perforation Treatment Performed - Jet Perforation |
2003-11-27 | Well Log Performed |
2003-12-01 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-12-12 | Perforation | 971.50 | 975.00 | 13 |
2003-11-27 | Perforation | 334.00 | 338.00 | 13 |
2003-11-27 | Perforation | 321.00 | 324.00 | 13 |
2003-12-01 | Fracture | 321.00 | 381.00 | 0 |
2003-01-22 | Packing Device Capped w/Cement | 947.00 | 955.00 | 0 |
2003-01-22 | Perforation | 761.00 | 765.00 | 13 |
2003-01-25 | Fracture | 761.00 | 765.00 | 0 |
2003-01-27 | Perforation | 561.50 | 565.00 | 13 |
2003-11-24 | Cement Squeeze | 761.00 | 765.00 | 0 |
2003-11-24 | Cement Squeeze | 561.50 | 565.00 | 0 |
2003-11-27 | Perforation | 379.00 | 381.00 | 13 |
2003-11-27 | Perforation | 351.00 | 355.00 | 13 |
For data sources see[4]