X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214180810002

Well Details

Well ID: 0214180810002
Loading map...
Location: 00/10-08-021-18W4/2
Location Alias: 00/10-08-21-18 W4M
Location Alias 2: 00/10-08-021-18 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 18
Section: 08
County/Municipality: County of Newell
Well Name: TXNE COUNTESS 10-8-21-18
Operator Name: Torxen Energy Ltd.
License Number: 0034314
License Date: 1968-06-21
License Status: Abandoned
Spud Date: 1968-07-02
Final Drill Date: 1968-07-08
Well Total Depth: 1228.30 m
Surface Hole Latitude: 50.770583
Surface Hole Longitude: -112.459342

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-06-21 Obtained License
1968-07-08 Finished Drilling
1968-07-08 Well Mode changed to Drilled and Cased
1968-07-09 Drill Stem Test Performed
1968-07-10 Production Casing Operation Performed
1968-09-10 Perforation Treatment Performed - Jet Perforation
1998-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-11 Plug Back Performed
1998-09-11 Well Log Performed
1998-09-16 Well Log Performed
1998-09-18 Perforation Treatment Performed - Jet Perforation
1998-09-18 Well Log Performed
1998-09-18 Well Mode changed to Drilled and Cased
2007-10-25 Well Log Performed
2007-11-22 Perforation Treatment Performed - Jet Perforation
2007-11-22 Well Log Performed
2007-11-23 Perforation Treatment Performed - Remedial Casing
2007-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-24 Perforation Treatment Performed - Jet Perforation
2007-11-24 Well Log Performed
2007-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-26 Perforation Treatment Performed - Jet Perforation
2007-11-26 Perforation Treatment Performed - Remedial Casing
2007-11-26 Well Log Performed
2007-11-27 Perforation Treatment Performed - Remedial Casing
2007-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-29 Perforation Treatment Performed - Jet Perforation
2007-11-29 Perforation Treatment Performed - Remedial Casing
2007-11-29 Plug Back Performed
2007-11-29 Well Log Performed
2007-11-29 Well Mode changed to Abandoned Zone
2007-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-30 Perforation Treatment Performed - Remedial Casing
2007-12-01 Perforation Treatment Performed - Jet Perforation
2007-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-02 Perforation Treatment Performed - Jet Perforation
2007-12-02 Perforation Treatment Performed - Remedial Casing
2007-12-03 Perforation Treatment Performed - Cement Plug
2007-12-03 Perforation Treatment Performed - Remedial Casing
2007-12-07 Well Abandoned
2007-12-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-09-10 Perforation 1069.80 1072.30 7
2007-11-26 Perforation 482.00 483.00 14
2007-11-27 Remedial Casing Cementing 482.00 483.00 0
2007-11-28 Packing Device Capped w/Cement 470.00 478.50 0
2007-11-29 Perforation 302.00 303.00 14
2007-11-29 Remedial Casing Cementing 406.00 409.00 0
2007-11-29 Packing Device Capped w/Cement 386.30 404.50 0
2007-11-30 Remedial Casing Cementing 302.00 303.00 0
2007-11-30 Packing Device Capped w/Cement 282.50 300.50 0
2007-12-01 Perforation 215.00 216.00 14
2007-12-02 Remedial Casing Cementing 215.00 216.00 0
1998-09-11 Packing Device Capped w/Cement 1054.00 1062.00 0
2007-12-02 Packing Device Capped w/Cement 196.00 213.50 0
2007-12-02 Perforation 144.00 145.00 14
2007-12-03 Remedial Casing Cementing 144.00 145.00 0
2007-12-03 Cement Plug 27.00 145.00 0
1998-09-18 Perforation 406.00 409.00 20
2007-11-22 Perforation 700.00 701.00 14
2007-11-23 Remedial Casing Cementing 700.00 701.00 0
2007-11-24 Packing Device Capped w/Cement 691.00 699.50 0
2007-11-24 Perforation 580.00 581.00 14
2007-11-26 Remedial Casing Cementing 580.00 581.00 0
2007-11-26 Packing Device Capped w/Cement 571.00 579.50 0

For data sources see[4]



References