X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214161101004

Well Details

Well ID: 0214161101004
Loading map...
Location: 00/01-11-021-16W4/4
Location Alias: 00/01-11-21-16 W4M
Location Alias 2: 00/01-11-021-16 W4/04
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 16
Section: 11
County/Municipality: County of Newell
Well Name: TXNE 8A COUNTESS 1-11-21-16
Operator Name: Torxen Energy Ltd.
License Number: 0256039
License Date: 2001-06-08
License Status: Amended
Spud Date: 2001-06-21
Final Drill Date: 2001-06-24
Well Total Depth: 1252.00 m
Surface Hole Latitude: 50.768057
Surface Hole Longitude: -112.106264

For data sources see[1][2]

Well History

Date Event
2001-06-08 Obtained License
2001-06-22 Surface Casing Operation Performed
2001-06-23 Direction Drilling Operation Performed - Deviate
2001-06-24 Finished Drilling
2001-06-24 Well Log Performed
2001-06-24 Well Mode changed to Drilled and Cased
2001-06-25 Production Casing Operation Performed
2001-06-25 Rig Released
2001-06-26 Well Log Performed
2001-07-14 Perforation Treatment Performed - Jet Perforation
2001-07-14 Well Log Performed
2001-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-25 Perforation Treatment Performed - Jet Perforation
2001-07-25 Plug Back Performed
2001-07-25 Well Log Performed
2001-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-26 Perforation Treatment Performed - Jet Perforation
2001-08-26 Plug Back Performed
2001-08-26 Well Log Performed
2006-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-18 Plug Back Performed
2006-10-21 Perforation Treatment Performed - Jet Perforation
2006-10-21 Well Log Performed
2006-10-27 Perforation Treatment Performed - Fractured
2006-10-31 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-06-23 213.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-07-14 Perforation 1224.00 1227.00 20
2006-10-21 Perforation 531.00 532.00 7
2006-10-21 Perforation 463.50 464.50 7
2006-10-21 Perforation 438.00 439.00 7
2006-10-21 Perforation 424.50 425.50 7
2006-10-21 Perforation 413.00 414.00 7
2006-10-27 Fracture 954.00 955.00 0
2006-10-27 Fracture 840.00 842.00 0
2006-10-27 Fracture 543.00 544.00 0
2006-10-27 Fracture 531.00 532.00 0
2006-10-27 Fracture 463.50 464.50 0
2001-07-25 Packing Device Capped w/Cement 1212.00 1220.00 0
2006-10-27 Fracture 438.00 439.00 0
2006-10-27 Fracture 424.50 425.50 0
2006-10-27 Fracture 413.00 414.00 0
2001-07-25 Perforation 1077.00 1080.00 20
2001-08-26 Packing Device Capped w/Cement 1073.00 1076.00 0
2001-08-26 Perforation 1067.00 1069.00 17
2006-10-18 Packing Device Capped w/Cement 1052.00 1060.00 0
2006-10-21 Perforation 954.00 955.00 7
2006-10-21 Perforation 840.00 842.00 7
2006-10-21 Perforation 543.00 544.00 7

For data sources see[5]



References