X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214121806002

Well Details

Well ID: 0214121806002
Loading map...
Location: 00/06-18-021-12W4/2
Location Alias: 00/06-18-21-12 W4M
Location Alias 2: 00/06-18-021-12 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 12
Section: 18
County/Municipality: County of Newell
Well Name: ABERCAN ET AL PRINCESS 6-18-21-12
Operator Name: TAQA North Ltd.
License Number: 0053372
License Date: 1975-03-20
License Status: Issued
Spud Date: 1975-03-24
Final Drill Date: 1975-03-26
Well Total Depth: 676.70 m
Surface Hole Latitude: 50.782649
Surface Hole Longitude: -111.659689

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-20 Obtained License
1975-03-26 Finished Drilling
1975-03-26 Well Mode changed to Drilled and Cased
1975-03-27 Production Casing Operation Performed
1975-06-16 Perforation Treatment Performed - Jet Perforation
1975-06-18 Perforation Treatment Performed - Fractured
1975-06-25 Perforation Treatment Performed - Jet Perforation
1975-06-30 Perforation Treatment Performed - Fractured
1975-07-04 Perforation Treatment Performed - Jet Perforation
1975-07-09 Perforation Treatment Performed - Fractured
1976-02-29 Well Began Production
1976-02-29 Well Fluid changed to Gas
1976-02-29 Well Mode changed to Flowing
1994-01-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-06-16 Perforation 646.20 647.40 3
1975-07-04 Perforation 368.20 369.10 3
1975-07-04 Perforation 382.20 383.40 3
1975-07-09 Fracture 341.40 383.40 0
1975-06-16 Perforation 648.60 649.80 3
1975-06-16 Perforation 650.40 651.70 3
1975-06-18 Fracture 646.20 651.70 0
1975-06-25 Perforation 441.40 442.90 3
1975-06-25 Perforation 453.20 457.80 3
1975-06-30 Fracture 441.40 457.80 0
1975-07-04 Perforation 341.40 342.60 3
1975-07-04 Perforation 365.80 367.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 7154 0.0 0.0 0.0
1977 7881 0.0 0.0 0.0
1978 6404 0.0 0.0 0.0
1979 7774 0.0 0.0 0.0
1980 8175 0.0 0.0 0.0
1981 7647 0.0 0.0 0.0
1982 4517 0.0 0.0 0.0
1983 1085 0.0 0.0 0.0
1984 6371 0.0 0.0 0.0
1985 5383 0.0 0.0 0.0
1986 4798 0.0 0.0 0.0
1987 4036 0.0 0.0 0.0
1988 4087 0.0 0.0 0.0
1989 4794 0.0 0.0 0.0
1990 4298 0.0 0.0 0.0
1991 7505 0.0 0.0 0.0
1992 8382 0.0 0.0 0.0
1993 8493 0.0 0.0 0.0

For data sources see[5]

References