X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214121302000

Well Details

Well ID: 0214121302000
Loading map...
Location: 00/02-13-021-12W4/0
Location Alias: 00/02-13-21-12 W4M
Location Alias 2: 00/02-13-021-12 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 12
Section: 13
County/Municipality: Special Areas No. 2
Well Name: ANGLO CANADIAN STEVEVILLE NO. 1
Operator Name: Shell Canada Limited
License Number: B0000020
License Date: 1938-12-09
License Status: Re-Entered
Spud Date: 1938-12-24
Final Drill Date: 1939-01-18
Well Total Depth: 974.80 m
Surface Hole Latitude: 50.776990
Surface Hole Longitude: -111.536375

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1938-12-09 Obtained License
1939-01-18 Finished Drilling
1939-01-19 Production Casing Operation Performed
1939-05-24 Perforation Treatment Performed - Bullet Perforation
1939-05-27 Perforation Treatment Performed - Bullet Perforation
1939-05-28 Perforation Treatment Performed - Bullet Perforation
1939-06-09 Perforation Treatment Performed - Cement Plug
1939-06-28 Perforation Treatment Performed - Cement Plug
1939-07-05 Perforation Treatment Performed - Bullet Perforation
1939-07-06 Perforation Treatment Performed - Cement Plug
1939-07-06 Well Mode changed to Drilled and Cased
1959-05-30 Well Fluid changed to Gas
1959-05-30 Well Mode changed to Testing
1959-05-31 Well Abandoned
1959-05-31 Well Fluid changed to Gas
1959-05-31 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1939-05-24 Bullet Perforation 967.70 968.30 13
1939-05-27 Bullet Perforation 968.00 969.00 16
1939-05-27 Bullet Perforation 968.00 969.30 7
1939-05-27 Bullet Perforation 969.30 970.50 30
1939-05-28 Bullet Perforation 835.20 838.20 3
1939-06-09 Cement Plug 869.90 974.80 0
1939-06-28 Cement Plug 777.80 835.20 0
1939-07-05 Bullet Perforation 744.30 755.00 7
1939-07-06 Cement Plug 719.30 772.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References