X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214120614002

Well Details

Well ID: 0214120614002
Loading map...
Location: 00/14-06-021-12W4/2
Location Alias: 00/14-06-21-12 W4M
Location Alias 2: 00/14-06-021-12 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 12
Section: 06
County/Municipality: County of Newell
Well Name: ABERCAN ET AL PRINCESS 14-6-21-12
Operator Name: TAQA North Ltd.
License Number: 0067245
License Date: 1977-12-05
License Status: Issued
Spud Date: 1977-12-16
Final Drill Date: 1977-12-17
Well Total Depth: 682.10 m
Surface Hole Latitude: 50.758122
Surface Hole Longitude: -111.660215

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-05 Obtained License
1977-12-17 Finished Drilling
1977-12-17 Production Casing Operation Performed
1977-12-17 Well Mode changed to Drilled and Cased
1978-01-12 Perforation Treatment Performed - Jet Perforation
1978-01-14 Perforation Treatment Performed - Fractured
1978-01-16 Perforation Treatment Performed - Jet Perforation
1978-01-17 Perforation Treatment Performed - Fractured
1978-01-19 Perforation Treatment Performed - Fractured
1978-01-19 Perforation Treatment Performed - Selective Jet Perforations
1978-02-28 Well Began Production
1978-02-28 Well Fluid changed to Gas
1978-02-28 Well Mode changed to Flowing
1994-01-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-12 Perforation 656.50 657.80 7
1978-01-19 Selective Jet Perforations 353.90 356.30 0
1978-01-19 Selective Jet Perforations 356.90 359.10 0
1978-01-19 Selective Jet Perforations 359.40 360.00 0
1978-01-19 Selective Jet Perforations 360.30 360.60 0
1978-01-19 Selective Jet Perforations 372.80 383.40 0
1978-01-19 Selective Jet Perforations 383.70 383.70 0
1978-01-19 Fracture 334.40 383.70 0
1978-01-12 Perforation 658.40 659.60 7
1978-01-14 Fracture 656.50 659.60 0
1978-01-16 Perforation 449.90 451.40 7
1978-01-16 Perforation 452.30 452.90 7
1978-01-16 Perforation 460.90 463.30 7
1978-01-17 Fracture 449.90 463.30 0
1978-01-19 Selective Jet Perforations 334.40 334.70 0
1978-01-19 Selective Jet Perforations 352.70 353.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 0 0.0 0.0 0.0
1979 2186 0.0 0.0 0.0
1980 6626 0.0 0.0 0.0
1981 7688 0.0 0.0 0.0
1982 5005 0.0 0.0 0.0
1983 4348 0.0 0.0 0.0
1984 6992 0.0 0.0 0.0
1985 5224 0.0 0.0 0.0
1986 4770 0.0 0.0 0.0
1987 4031 0.0 0.0 0.0
1988 4369 0.0 0.0 0.0
1989 5312 0.0 0.0 0.0
1990 3934 0.0 0.0 0.0
1991 7596 0.0 0.0 0.0
1992 8154 0.0 0.0 0.0
1993 8493 0.0 0.0 0.0

For data sources see[5]

References