X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214092606000

Well Details

Well ID: 0214092606000
Loading map...
Location: 00/06-26-021-09W4/0
Location Alias: 00/06-26-21-09 W4M
Location Alias 2: 00/06-26-021-09 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 09
Section: 26
County/Municipality: Special Areas No. 2
Well Name: MERIT ET AL JENNER 6-26-21-9
Operator Name: ARC Resources Ltd.
License Number: 0058906
License Date: 1976-06-29
License Status: RecCertified
Spud Date: 1976-06-30
Final Drill Date: 1976-07-02
Well Total Depth: 525.80 m
Surface Hole Latitude: 50.811835
Surface Hole Longitude: -111.147874

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-29 Obtained License
1976-07-01 Lost Circulation Occurred
1976-07-02 Finished Drilling
1976-07-02 Well Log Performed
1976-07-02 Well Mode changed to Drilled and Cased
1976-07-03 Production Casing Operation Performed
1976-08-26 Perforation Treatment Performed - Selective Bullet Perforations
1976-08-28 Perforation Treatment Performed - Fractured
1977-01-01 Well Began Production
1977-01-01 Well Fluid changed to Gas
1977-01-01 Well Mode changed to Flowing
1992-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-04-27 Plug Back Performed
1992-04-27 Well Abandoned
1992-04-27 Well Fluid changed to Gas
1992-04-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-26 Selective Bullet Perforations 340.20 364.20 0
1976-08-26 Selective Bullet Perforations 476.10 503.20 0
1976-08-26 Selective Bullet Perforations 504.40 504.40 0
1976-08-28 Fracture 340.20 504.40 0
1992-04-27 Packing Device Capped w/Cement 327.00 335.00 0
1976-08-26 Selective Bullet Perforations 372.80 374.00 0
1976-08-26 Selective Bullet Perforations 376.10 381.00 0
1976-08-26 Selective Bullet Perforations 384.00 399.30 0
1976-08-26 Selective Bullet Perforations 399.90 400.50 0
1976-08-26 Selective Bullet Perforations 401.10 401.70 0
1976-08-26 Selective Bullet Perforations 402.30 405.10 0
1976-08-26 Selective Bullet Perforations 406.00 432.20 0
1976-08-26 Selective Bullet Perforations 473.40 474.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 6532 0.0 0.0 0.0
1978 6091 0.0 0.0 0.0
1979 6215 0.0 0.0 0.0
1980 5123 0.0 0.0 0.0
1981 6346 0.0 0.0 0.0
1982 8728 0.0 0.0 0.0
1983 8572 0.0 0.0 0.0
1984 8716 0.0 0.0 0.0
1985 8603 0.0 0.0 0.0
1986 8706 0.0 0.0 0.0
1987 8752 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8748 0.0 0.0 0.0
1990 8607 0.0 0.0 0.0
1991 5829 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-07-01 Lost Circulation 106.70 243.80

For data sources see[6]

References