X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214092206000

Well Details

Well ID: 0214092206000
Loading map...
Location: 00/06-22-021-09W4/0
Location Alias: 00/06-22-21-09 W4M
Location Alias 2: 00/06-22-021-09 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 09
Section: 22
County/Municipality: Special Areas No. 2
Well Name: MAGNUMENERGY JENNER 6-22-21-9
Operator Name: Aeraden Energy Corp.
License Number: 0060226
License Date: 1976-09-17
License Status: Abandoned
Spud Date: 1976-09-18
Final Drill Date: 1976-09-19
Well Total Depth: 518.20 m
Surface Hole Latitude: 50.796981
Surface Hole Longitude: -111.170930

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-17 Obtained License
1976-09-19 Finished Drilling
1976-09-19 Well Mode changed to Drilled and Cased
1976-09-20 Production Casing Operation Performed
1976-11-07 Perforation Treatment Performed - Selective Bullet Perforations
1976-11-11 Perforation Treatment Performed - Fractured
1977-01-01 Well Began Production
1977-01-01 Well Fluid changed to Gas
1977-01-01 Well Mode changed to Flowing
1991-10-01 Well Fluid changed to Gas
1991-10-01 Well Mode changed to Suspended
1992-07-01 Well Fluid changed to Gas
1992-07-01 Well Mode changed to Flowing
2015-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-01 Plug Back Performed
2015-09-01 Well Fluid changed to Gas
2015-09-01 Well Mode changed to Abandoned Zone
2015-09-23 Well Abandoned
2015-09-23 Well Fluid changed to Gas
2015-09-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-07 Selective Bullet Perforations 353.30 369.10 0
1976-11-07 Selective Bullet Perforations 458.40 463.60 0
1976-11-07 Selective Bullet Perforations 464.50 464.50 0
1976-11-11 Fracture 353.30 464.50 0
2015-09-01 Packing Device Capped w/Cement 419.00 427.00 0
2015-09-01 Packing Device Capped w/Cement 319.00 327.00 0
1976-11-07 Selective Bullet Perforations 372.20 374.00 0
1976-11-07 Selective Bullet Perforations 375.20 376.40 0
1976-11-07 Selective Bullet Perforations 381.30 383.10 0
1976-11-07 Selective Bullet Perforations 387.70 388.30 0
1976-11-07 Selective Bullet Perforations 388.90 389.50 0
1976-11-07 Selective Bullet Perforations 390.10 391.10 0
1976-11-07 Selective Bullet Perforations 392.30 394.40 0
1976-11-07 Selective Bullet Perforations 397.20 402.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 6504 0.0 0.0 0.0
1978 6046 0.0 0.0 0.0
1979 6352 0.0 0.0 0.0
1980 5177 0.0 0.0 0.0
1981 6338 0.0 0.0 0.0
1982 8745 0.0 0.0 0.0
1983 8746 0.0 0.0 0.0
1984 8757 0.0 0.0 0.0
1985 8661 0.0 0.0 0.0
1986 8732 0.0 0.0 0.0
1987 8758 0.0 0.0 0.0
1988 7983 0.0 0.0 0.0
1989 8310 0.0 0.0 0.0
1990 8520 0.0 0.0 0.0
1991 5828 0.0 0.0 0.0
1992 4416 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8621 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8751 0.0 0.0 0.0
1997 8015 0.0 0.0 0.0
2004 1320 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8751 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8764 0.0 0.0 0.0
2009 8512 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8636 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8171 0.0 0.0 0.0
2015 3734 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-01 No Incident Encountered 0.00 0.00

For data sources see[6]

References