X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214062207002

Well Details

Well ID: 0214062207002
Loading map...
Location: 00/07-22-021-06W4/2
Location Alias: 00/07-22-21-06 W4M
Location Alias 2: 00/07-22-021-06 W4/02
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 22
County/Municipality: Special Areas No. 2
Well Name: HEMISPHERE ATL-BUFF 7-22-21-6
Operator Name: Hemisphere Energy Corporation
License Number: 0198915
License Date: 1997-03-04
License Status: Abandoned
Spud Date: 1997-03-08
Final Drill Date: 1997-03-15
Well Total Depth: 1241.00 m
Surface Hole Latitude: 50.797727
Surface Hole Longitude: -110.750502

For data sources see[1][2]

Well History

Date Event
1997-03-04 Obtained License
1997-03-09 Lost Circulation Occurred
1997-03-09 Surface Casing Operation Performed
1997-03-15 Finished Drilling
1997-03-15 Well Log Performed
1997-03-15 Well Mode changed to Drilled and Cased
1997-03-16 Well Log Performed
1997-03-17 Production Casing Operation Performed
1997-03-17 Rig Released
1997-04-12 Perforation Treatment Performed - Jet Perforation
1997-04-12 Well Log Performed
1997-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-22 Plug Back Performed
1997-04-23 Perforation Treatment Performed - Jet Perforation
1997-04-23 Well Log Performed
1997-04-24 Perforation Treatment Performed - Jet Perforation
1997-04-24 Well Log Performed
1997-04-24 Well Mode changed to Drilled and Cased
2003-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-22 Perforation Treatment Performed - Jet Perforation
2003-04-22 Plug Back Performed
2003-04-22 Well Log Performed
2003-04-22 Well Mode changed to Abandoned Zone
2003-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-23 Plug Back Performed
2003-09-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-12 Perforation 1149.50 1152.50 14
2003-04-23 Packing Device Capped w/Cement 735.00 743.50 0
1997-04-12 Perforation 1154.00 1156.50 14
1997-04-14 Acid Treatment 1149.50 1156.50 0
1997-04-20 Acid Treatment 1149.50 1156.50 0
1997-04-22 Packing Device Capped w/Cement 1135.70 1143.70 0
1997-04-23 Perforation 915.00 917.00 13
1997-04-24 Perforation 909.00 910.00 14
2003-04-22 Packing Device Capped w/Cement 893.00 901.00 0
2003-04-22 Perforation 749.50 951.00 14

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-03-09 Lost Circulation 241.00 252.00

For data sources see[5]

References