If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0214061811000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.784889,"lon":-110.826872,"icon":""}]} |
Location: 00/11-18-021-06W4/0 | |
Location Alias: 00/11-18-21-06 W4M | |
Location Alias 2: 00/11-18-021-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 021 | |
Meridian: 4 | |
Range: 06 | |
Section: 18 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CHAMBERLAIN BUFFALO # 11-18 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0010106 | |
License Date: 1955-09-02 | |
License Status: RecCertified | |
Spud Date: 1955-09-03 | |
Final Drill Date: 1955-09-13 | |
Well Total Depth: 1004.00 m | |
Surface Hole Latitude: 50.784889 | |
Surface Hole Longitude: -110.826872 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1955-09-02 | Obtained License |
1955-09-08 | Drill Stem Test Performed |
1955-09-10 | Drill Stem Test Performed |
1955-09-11 | Drill Stem Test Performed |
1955-09-12 | Drill Stem Test Performed |
1955-09-13 | Drill Stem Test Performed |
1955-09-13 | Finished Drilling |
1955-09-14 | Production Casing Operation Performed |
1955-10-03 | Well Mode changed to Drilled and Cased |
1957-05-20 | Perforation Treatment Performed - Jet Perforation |
1957-05-27 | Well Mode changed to Drilled and Cased |
1958-08-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-12-12 | Well Began Production |
1958-12-12 | Well Fluid changed to Gas |
1958-12-12 | Well Mode changed to Flowing |
1960-05-09 | Perforation Treatment Performed - Jet Perforation |
1961-05-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1961-05-29 | Perforation Treatment Performed - Condensate Squeeze |
1961-05-29 | Plug Back Performed |
1963-04-09 | Well Fluid changed to Gas |
1963-04-09 | Well Mode changed to Suspended |
1971-10-19 | Perforation Treatment Performed - Cement Squeeze |
1971-10-20 | Perforation Treatment Performed - Cement Plug |
1971-10-20 | Plug Back Performed |
1971-10-21 | Well Abandoned |
1971-10-21 | Well Fluid changed to Gas |
1971-10-21 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-05-20 | Perforation | 795.50 | 797.40 | 13 |
1957-05-20 | Perforation | 981.50 | 982.70 | 13 |
1958-08-06 | Acid Treatment | 795.50 | 797.40 | 0 |
1960-05-09 | Perforation | 796.10 | 796.40 | 7 |
1961-05-29 | Condensate Squeeze | 795.50 | 797.40 | 0 |
1961-05-29 | Packing Device Capped w/Cement | 944.50 | 952.50 | 0 |
1971-10-19 | Cement Squeeze | 795.50 | 797.40 | 0 |
1971-10-20 | Cement Plug | 774.20 | 797.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]