X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214061504000

Well Details

Well ID: 0214061504000
Loading map...
Location: 00/04-15-021-06W4/0
Location Alias: 00/04-15-21-06 W4M
Location Alias 2: 00/04-15-021-06 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 15
County/Municipality: Special Areas No. 2
Well Name: CRESTAR ET AL ATLEE 4-15-21-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0130727
License Date: 1987-12-17
License Status: RecCertified
Spud Date: 1987-12-18
Final Drill Date: 1987-12-21
Well Total Depth: 1035.00 m
Surface Hole Latitude: 50.779288
Surface Hole Longitude: -110.761563

For data sources see[1][2]

Well History

Date Event
1987-12-17 Obtained License
1987-12-19 Surface Casing Operation Performed
1987-12-21 Finished Drilling
1987-12-21 Well Log Performed
1987-12-21 Well Mode changed to Drilled and Cased
1987-12-22 Production Casing Operation Performed
1987-12-22 Rig Released
1988-01-10 Well Log Performed
1988-01-14 Perforation Treatment Performed - Jet Perforation
1988-01-14 Well Log Performed
1988-01-20 Well Began Production
1988-01-20 Well Fluid changed to Crude Oil
1988-01-20 Well Mode changed to Pumping
1988-02-05 Well Log Performed
1988-02-06 Perforation Treatment Performed - Jet Perforation
1988-02-23 Well Fluid changed to Crude Oil
1988-02-23 Well Mode changed to Suspended
1989-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-25 Plug Back Performed
1989-09-25 Well Fluid changed to Crude Oil
1989-09-25 Well Mode changed to Abandoned Zone
1989-09-26 Perforation Treatment Performed - Jet Perforation
1989-09-26 Well Log Performed
1995-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-08 Plug Back Performed
1995-07-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-01-14 Perforation 965.80 966.80 14
1988-02-06 Perforation 966.80 967.80 14
1989-09-25 Packing Device Capped w/Cement 952.00 960.00 0
1989-09-26 Perforation 795.40 796.40 13
1995-07-08 Packing Device Capped w/Cement 779.50 787.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 640 0.0 0.0 0.0

For data sources see[5]

References