X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214060916000

Well Details

Well ID: 0214060916000
Loading map...
Location: 00/16-09-021-06W4/0
Location Alias: 00/16-09-21-06 W4M
Location Alias 2: 00/16-09-021-06 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 09
County/Municipality: Special Areas No. 2
Well Name: CRESTAR ATLEE-BUFFALO 16-9-21-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0128157
License Date: 1987-08-27
License Status: RecCertified
Spud Date: 1987-09-09
Final Drill Date: 1987-09-14
Well Total Depth: 1037.00 m
Surface Hole Latitude: 50.772780
Surface Hole Longitude: -110.771747

For data sources see[1][2]

Well History

Date Event
1987-08-27 Obtained License
1987-09-10 Surface Casing Operation Performed
1987-09-14 Finished Drilling
1987-09-14 Well Log Performed
1987-09-14 Well Mode changed to Drilled and Cased
1987-09-15 Drill Stem Test Performed
1987-09-17 Production Casing Operation Performed
1987-09-17 Rig Released
1987-10-17 Perforation Treatment Performed - Jet Perforation
1987-10-17 Well Log Performed
1987-11-01 Well Began Production
1987-11-01 Well Fluid changed to Crude Oil
1987-11-01 Well Mode changed to Pumping
1988-01-28 Well Log Performed
1988-01-30 Perforation Treatment Performed - Cement Squeeze
1988-02-03 Perforation Treatment Performed - Jet Perforation
1988-02-03 Well Log Performed
1993-09-01 Well Fluid changed to Crude Oil
1993-09-01 Well Mode changed to Suspended
1995-04-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-19 Plug Back Performed
1995-04-19 Well Fluid changed to Crude Oil
1995-04-19 Well Log Performed
1995-04-19 Well Mode changed to Abandoned Zone
1995-04-21 Well Log Performed
1995-04-22 Perforation Treatment Performed - Jet Perforation
1995-05-03 Perforation Treatment Performed - Fractured
1995-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-14 Plug Back Performed
1995-07-14 Well Abandoned
1995-07-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-10-17 Perforation 975.00 976.00 13
1988-01-30 Cement Squeeze 975.00 976.00 0
1988-02-03 Perforation 971.50 972.50 13
1995-04-19 Packing Device Capped w/Cement 962.00 970.00 0
1995-04-22 Perforation 900.50 904.00 14
1995-05-03 Fracture 900.50 904.00 0
1995-07-14 Packing Device Capped w/Cement 877.00 885.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 745 0.0 0.0 0.0
1988 3593 0.0 0.0 0.0
1989 6283 0.0 0.0 0.0
1990 8674 0.0 0.0 0.0
1991 8637 0.0 0.0 0.0
1992 8505 0.0 0.0 0.0
1993 4004 0.0 0.0 0.0

For data sources see[5]

References