X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214060106000

Well Details

Well ID: 0214060106000
Loading map...
Location: 00/06-01-021-06W4/0
Location Alias: 00/06-01-21-06 W4M
Location Alias 2: 00/06-01-021-06 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 06
Section: 01
County/Municipality: Special Areas No. 2
Well Name: RIDGEBACK ATL-BUFF 6-1-21-6
Operator Name: Ridgeback Resources Inc.
License Number: 0096684
License Date: 1982-07-16
License Status: Suspension
Spud Date: 1982-07-16
Final Drill Date: 1982-07-18
Well Total Depth: 590.00 m
Surface Hole Latitude: 50.750855
Surface Hole Longitude: -110.711144

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-07-16 Obtained License
1982-07-18 Finished Drilling
1982-07-18 Production Casing Operation Performed
1982-07-18 Well Mode changed to Drilled and Cased
1982-08-03 Perforation Treatment Performed - Jet Perforation
1982-08-04 Perforation Treatment Performed - Fractured
1982-12-01 Well Began Production
1982-12-01 Well Fluid changed to Gas
1982-12-01 Well Mode changed to Flowing
2002-09-16 Perforation Treatment Performed - Jet Perforation
2002-09-16 Well Log Performed
2002-09-19 Perforation Treatment Performed - Fractured
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-09-23 Perforation Treatment Performed - Fractured
2002-09-27 Well Fluid changed to Gas
2002-09-27 Well Mode changed to Flowing
2020-01-01 Well Fluid changed to Gas
2020-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-08-03 Perforation 513.00 516.00 13
2002-09-23 Fracture 440.00 444.00 0
2002-09-23 Fracture 428.00 435.00 0
2002-09-23 Fracture 423.50 425.00 0
1982-08-04 Fracture 513.00 516.00 0
2002-09-16 Perforation 513.00 516.00 13
2002-09-19 Fracture 513.00 515.00 0
2002-09-20 Perforation 447.00 454.00 13
2002-09-20 Perforation 440.00 444.00 13
2002-09-20 Perforation 428.00 435.00 13
2002-09-20 Perforation 423.50 425.00 13
2002-09-23 Fracture 447.00 454.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 736 0.0 0.0 0.0
1983 5328 0.0 0.0 0.0
1984 5130 0.0 0.0 0.0
1985 1509 0.0 0.0 0.0
1986 5893 0.0 0.0 0.0
1987 4551 0.0 0.0 0.0
1988 3715 0.0 0.0 0.0
1989 2574 0.0 0.0 0.0
1990 526 0.0 0.0 0.0
1991 1625 0.0 0.0 0.0
1992 7834 0.0 0.0 0.0
1993 8563 0.0 0.0 0.0
1994 8483 0.0 0.0 0.0
1995 8706 0.0 0.0 0.0
1996 8737 0.0 0.0 0.0
1997 8683 0.0 0.0 0.0
1998 8359 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 6359 0.0 0.0 0.0
2002 5376 0.0 0.0 0.0
2003 5568 0.0 0.0 0.0
2004 4752 0.0 0.0 0.0
2005 7301 0.0 0.0 0.0
2006 8009 0.0 0.0 0.0
2007 8519 0.0 0.0 0.0
2008 5663 0.0 0.0 0.0
2009 8399 0.0 0.0 0.0
2010 7877 0.0 0.0 0.0
2011 6537 0.0 0.0 0.0
2012 8722 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8709 0.0 0.0 0.0
2015 8571 0.0 0.0 0.0
2016 8403 0.0 0.0 0.0
2017 8743 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 3599 0.0 0.0 0.0

For data sources see[5]

References