X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214052606000

Well Details

Well ID: 0214052606000
Loading map...
Location: 00/06-26-021-05W4/0
Location Alias: 00/06-26-21-05 W4M
Location Alias 2: 00/06-26-021-05 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 05
Section: 26
County/Municipality: Special Areas No. 2
Well Name: LEGACY ET AL BUFFALO 6-26-21-5
Operator Name: Legacy Petroleum Ltd.
License Number: 0058244
License Date: 1976-05-18
License Status: RecCertified
Spud Date: 1976-05-24
Final Drill Date: 1976-05-29
Well Total Depth: 954.60 m
Surface Hole Latitude: 50.808931
Surface Hole Longitude: -110.598815

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-05-18 Obtained License
1976-05-29 Finished Drilling
1976-05-29 Production Casing Operation Performed
1976-05-30 Well Mode changed to Drilled and Cased
1977-10-29 Perforation Treatment Performed - Jet Perforation
1977-10-31 Perforation Treatment Performed - Fractured
1977-12-21 Well Began Production
1977-12-21 Well Fluid changed to Gas
1977-12-21 Well Mode changed to Flowing
1998-03-02 Well Fluid changed to Gas
1998-03-02 Well Mode changed to Closed
2003-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-17 Plug Back Performed
2003-10-17 Well Fluid changed to Gas
2003-10-17 Well Mode changed to Abandoned Zone
2003-10-22 Perforation Treatment Performed - Cement Plug
2003-10-22 Plug Back Performed
2004-10-02 Well Abandoned
2004-10-02 Well Fluid changed to Gas
2004-10-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-29 Perforation 437.10 439.50 13
1977-10-31 Fracture 437.10 439.50 0
2003-10-17 Packing Device Capped w/Cement 419.00 427.00 0
2003-10-22 Cement Plug 76.00 153.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 7082 0.0 0.0 0.0
1979 7943 0.0 0.0 0.0
1980 8620 0.0 0.0 0.0
1981 8535 0.0 0.0 0.0
1982 8637 0.0 0.0 0.0
1983 7212 0.0 0.0 0.0
1984 7496 0.0 0.0 0.0
1985 7302 0.0 0.0 0.0
1986 7287 0.0 0.0 0.0
1987 8667 0.0 0.0 0.0
1988 8722 0.0 0.0 0.0
1989 8446 0.0 0.0 0.0
1990 8447 0.0 0.0 0.0
1991 6801 0.0 0.0 0.0
1992 8716 0.0 0.0 0.0
1993 5875 0.0 0.0 0.0

For data sources see[5]

References