X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214043616000

Well Details

Well ID: 0214043616000
Loading map...
Location: 00/16-36-021-04W4/0
Location Alias: 00/16-36-21-04 W4M
Location Alias 2: 00/16-36-021-04 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 04
Section: 36
County/Municipality: Special Areas No. 2
Well Name: HIGHFIELD ET AL ATLEE 16-36-21-4
Operator Name: Devon Canada Corporation
License Number: 0066312
License Date: 1977-10-24
License Status: Re-Entered
Spud Date: 1977-10-25
Final Drill Date: 1977-10-26
Well Total Depth: 455.40 m
Surface Hole Latitude: 50.833592
Surface Hole Longitude: -110.420916

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-24 Obtained License
1977-10-26 Finished Drilling
1977-10-26 Production Casing Operation Performed
1977-10-26 Well Mode changed to Drilled and Cased
1977-11-09 Perforation Treatment Performed - Jet Perforation
1977-11-20 Perforation Treatment Performed - Fractured
1977-12-02 Perforation Treatment Performed - Fractured
1977-12-02 Perforation Treatment Performed - Jet Perforation
1977-12-02 Perforation Treatment Performed - Selective Jet Perforations
1977-12-07 Well Began Production
1977-12-07 Well Fluid changed to Gas
1977-12-07 Well Mode changed to Flowing
1995-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-30 Plug Back Performed
1995-09-30 Well Fluid changed to Gas
1995-09-30 Well Mode changed to Abandoned
1995-10-01 Well Fluid changed to Gas
1995-10-01 Well Mode changed to Abandoned and Re-entered
1995-10-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-09 Perforation 425.20 426.70 7
1977-12-02 Fracture 336.80 362.10 0
1995-09-30 Packing Device Capped w/Cement 317.00 325.00 0
1977-11-20 Fracture 425.20 426.70 0
1977-12-02 Perforation 336.80 337.70 3
1977-12-02 Selective Jet Perforations 342.00 342.60 0
1977-12-02 Selective Jet Perforations 343.20 345.90 0
1977-12-02 Selective Jet Perforations 352.30 352.70 0
1977-12-02 Selective Jet Perforations 360.30 361.80 0
1977-12-02 Selective Jet Perforations 338.60 338.90 0
1977-12-02 Selective Jet Perforations 362.10 362.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 589 0.0 0.0 0.0
1978 7052 0.0 0.0 0.0
1979 7184 0.0 0.0 0.0
1980 7027 0.0 0.0 0.0
1981 6320 0.0 0.0 0.0
1982 7000 0.0 0.0 0.0
1983 2662 0.0 0.0 0.0
1984 7170 0.0 0.0 0.0
1985 6903 0.0 0.0 0.0
1986 8710 0.0 0.0 0.0
1987 8733 0.0 0.0 0.0
1988 8714 0.0 0.0 0.0
1989 8742 0.0 0.0 0.0
1990 8052 0.0 0.0 0.0
1991 8556 0.0 0.0 0.0
1992 8650 0.0 0.0 0.0
1993 8753 0.0 0.0 0.0
1994 8715 0.0 0.0 0.0
1995 6467 0.0 0.0 0.0

For data sources see[5]

References