X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214043606000

Well Details

Well ID: 0214043606000
Loading map...
Location: 00/06-36-021-04W4/0
Location Alias: 00/06-36-21-04 W4M
Location Alias 2: 00/06-36-021-04 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 04
Section: 36
County/Municipality: Special Areas No. 2
Well Name: CRL HB ET AL ATLEE 6-36-21-4
Operator Name: Devon Canada Corporation
License Number: 0054827
License Date: 1975-09-08
License Status: RecCertified
Spud Date: 1975-10-02
Final Drill Date: 1975-10-03
Well Total Depth: 454.20 m
Surface Hole Latitude: 50.823408
Surface Hole Longitude: -110.437051

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-08 Obtained License
1975-10-02 Lost Circulation Occurred
1975-10-03 Finished Drilling
1975-10-03 Production Casing Operation Performed
1975-10-03 Well Mode changed to Drilled and Cased
1975-11-16 Perforation Treatment Performed - Jet Perforation
1975-11-18 Perforation Treatment Performed - Fractured
1975-11-29 Perforation Treatment Performed - Bullet Perforation
1975-11-30 Perforation Treatment Performed - Fractured
1976-01-31 Well Began Production
1976-01-31 Well Fluid changed to Gas
1976-01-31 Well Mode changed to Flowing
1990-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-18 Plug Back Performed
1990-06-18 Well Fluid changed to Gas
1990-06-18 Well Log Performed
1990-06-18 Well Mode changed to Abandoned
1990-06-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-16 Perforation 423.70 426.70 7
1990-06-18 Packing Device Capped w/Cement 409.00 417.00 0
1990-06-18 Packing Device Capped w/Cement 321.00 329.00 0
1975-11-18 Fracture 423.70 426.70 0
1975-11-29 Bullet Perforation 335.60 336.80 3
1975-11-29 Bullet Perforation 340.80 342.00 3
1975-11-29 Bullet Perforation 351.10 351.70 3
1975-11-29 Bullet Perforation 359.70 360.90 3
1975-11-29 Bullet Perforation 362.70 363.00 3
1975-11-29 Bullet Perforation 373.10 373.70 3
1975-11-30 Fracture 335.60 373.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 7999 0.0 0.0 0.0
1977 8157 0.0 0.0 0.0
1978 7722 0.0 0.0 0.0
1979 7184 0.0 0.0 0.0
1980 7025 0.0 0.0 0.0
1981 6318 0.0 0.0 0.0
1982 7014 0.0 0.0 0.0
1983 2599 0.0 0.0 0.0
1984 7550 0.0 0.0 0.0
1985 7019 0.0 0.0 0.0
1986 8728 0.0 0.0 0.0
1987 8687 0.0 0.0 0.0
1988 8722 0.0 0.0 0.0
1989 8003 0.0 0.0 0.0
1990 3935 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-10-02 Lost Circulation 64.00 94.50

For data sources see[6]

References