X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214043506000

Well Details

Well ID: 0214043506000
Loading map...
Location: 00/06-35-021-04W4/0
Location Alias: 00/06-35-21-04 W4M
Location Alias 2: 00/06-35-021-04 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 04
Section: 35
County/Municipality: Special Areas No. 2
Well Name: CRL HB ET AL ATLEE 6-35-21-4
Operator Name: Devon Canada Corporation
License Number: 0054825
License Date: 1975-09-05
License Status: RecCertified
Spud Date: 1975-09-30
Final Drill Date: 1975-10-02
Well Total Depth: 451.10 m
Surface Hole Latitude: 50.825336
Surface Hole Longitude: -110.457487

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-05 Obtained License
1975-10-01 Lost Circulation Occurred
1975-10-02 Finished Drilling
1975-10-02 Production Casing Operation Performed
1975-10-02 Well Mode changed to Drilled and Cased
1975-10-31 Perforation Treatment Performed - Jet Perforation
1975-11-05 Perforation Treatment Performed - Fractured
1975-11-16 Perforation Treatment Performed - Bullet Perforation
1975-11-16 Perforation Treatment Performed - Selective Bullet Perforations
1975-11-17 Perforation Treatment Performed - Fractured
1976-01-31 Well Began Production
1976-01-31 Well Fluid changed to Gas
1976-01-31 Well Mode changed to Flowing
1988-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-24 Plug Back Performed
1988-03-24 Well Abandoned
1988-03-24 Well Fluid changed to Gas
1988-03-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-31 Perforation 420.60 423.70 7
1988-03-24 Packing Device Capped w/Cement 313.00 321.00 0
1975-11-05 Fracture 420.60 423.70 0
1975-11-16 Selective Bullet Perforations 331.90 331.90 0
1975-11-16 Bullet Perforation 333.10 334.10 3
1975-11-16 Bullet Perforation 338.00 338.90 3
1975-11-16 Bullet Perforation 341.70 342.60 3
1975-11-16 Bullet Perforation 356.30 357.50 3
1975-11-16 Bullet Perforation 368.20 368.80 3
1975-11-17 Fracture 331.90 368.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 7999 0.0 0.0 0.0
1977 8157 0.0 0.0 0.0
1978 7684 0.0 0.0 0.0
1979 5887 0.0 0.0 0.0
1980 7025 0.0 0.0 0.0
1981 6318 0.0 0.0 0.0
1982 7427 0.0 0.0 0.0
1983 2597 0.0 0.0 0.0
1984 6668 0.0 0.0 0.0
1985 7514 0.0 0.0 0.0
1986 8742 0.0 0.0 0.0
1987 8719 0.0 0.0 0.0
1988 1415 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-10-01 Lost Circulation 91.40 91.40

For data sources see[6]

References