X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214042708000

Well Details

Well ID: 0214042708000
Loading map...
Location: 00/08-27-021-04W4/0
Location Alias: 00/08-27-21-04 W4M
Location Alias 2: 00/08-27-021-04 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 04
Section: 27
County/Municipality: Special Areas No. 2
Well Name: ACTION ET AL ATLEE 8-27-21-4
Operator Name: EOG Resources Canada Company
License Number: 0066210
License Date: 1977-10-18
License Status: RecCertified
Spud Date: 1977-10-18
Final Drill Date: 1977-10-20
Well Total Depth: 467.90 m
Surface Hole Latitude: 50.810848
Surface Hole Longitude: -110.467500

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-18 Obtained License
1977-10-19 Lost Circulation Occurred
1977-10-20 Finished Drilling
1977-10-20 Production Casing Operation Performed
1977-10-20 Well Mode changed to Drilled and Cased
1977-11-04 Perforation Treatment Performed - Jet Perforation
1977-11-29 Perforation Treatment Performed - Fractured
1977-11-30 Perforation Treatment Performed - Selective Jet Perforations
1977-12-04 Perforation Treatment Performed - Fractured
1977-12-10 Well Began Production
1977-12-10 Well Fluid changed to Gas
1977-12-10 Well Mode changed to Flowing
1990-06-19 Well Log Performed
1990-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-20 Plug Back Performed
1990-06-20 Well Fluid changed to Gas
1990-06-20 Well Mode changed to Abandoned
1990-06-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-04 Perforation 429.80 432.50 7
1977-11-30 Selective Jet Perforations 373.10 375.20 0
1977-12-04 Fracture 340.50 375.20 0
1990-06-20 Packing Device Capped w/Cement 417.00 425.00 0
1990-06-20 Packing Device Capped w/Cement 330.00 338.00 0
1977-11-29 Fracture 429.80 432.50 0
1977-11-30 Selective Jet Perforations 340.50 342.00 0
1977-11-30 Selective Jet Perforations 343.20 343.80 0
1977-11-30 Selective Jet Perforations 344.40 348.40 0
1977-11-30 Selective Jet Perforations 349.00 349.60 0
1977-11-30 Selective Jet Perforations 351.40 352.70 0
1977-11-30 Selective Jet Perforations 360.30 360.90 0
1977-11-30 Selective Jet Perforations 361.50 363.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 528 0.0 0.0 0.0
1978 7460 0.0 0.0 0.0
1979 5887 0.0 0.0 0.0
1980 7024 0.0 0.0 0.0
1981 6314 0.0 0.0 0.0
1982 7941 0.0 0.0 0.0
1983 8733 0.0 0.0 0.0
1984 6972 0.0 0.0 0.0
1985 7454 0.0 0.0 0.0
1986 4417 0.0 0.0 0.0
1987 4225 0.0 0.0 0.0
1988 5647 0.0 0.0 0.0
1989 7433 0.0 0.0 0.0
1990 2160 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-10-19 Lost Circulation 65.80 65.80

For data sources see[6]

References