X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214033114000

Well Details

Well ID: 0214033114000
Loading map...
Location: 00/14-31-021-03W4/0
Location Alias: 00/14-31-21-03 W4M
Location Alias 2: 00/14-31-021-03 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 03
Section: 31
County/Municipality: Special Areas No. 2
Well Name: HIGHFIELD ET AL ATLEE 14-31-21-3
Operator Name: Devon Canada Corporation
License Number: 0076946
License Date: 1979-07-17
License Status: Re-Entered
Spud Date: 1979-08-14
Final Drill Date: 1979-08-15
Well Total Depth: 475.00 m
Surface Hole Latitude: 50.833600
Surface Hole Longitude: -110.409230

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-17 Obtained License
1979-08-15 Finished Drilling
1979-08-15 Production Casing Operation Performed
1979-08-15 Well Mode changed to Drilled and Cased
1979-08-27 Perforation Treatment Performed - Jet Perforation
1979-09-04 Perforation Treatment Performed - Fractured
1979-10-16 Well Began Production
1979-10-16 Well Fluid changed to Gas
1979-10-16 Well Mode changed to Flowing
1982-11-05 Perforation Treatment Performed - Jet Perforation
1982-11-10 Perforation Treatment Performed - Fractured
1995-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-30 Plug Back Performed
1995-09-30 Well Fluid changed to Gas
1995-09-30 Well Mode changed to Abandoned
1995-10-01 Well Fluid changed to Gas
1995-10-01 Well Mode changed to Abandoned and Re-entered
1995-10-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-27 Perforation 423.00 426.00 7
1979-09-04 Fracture 423.00 426.00 0
1982-11-05 Perforation 357.50 360.50 3
1982-11-05 Perforation 339.50 342.00 3
1982-11-05 Perforation 334.00 337.00 3
1982-11-10 Fracture 334.00 360.50 0
1995-09-30 Packing Device Capped w/Cement 312.00 320.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1823 0.0 0.0 0.0
1980 7024 0.0 0.0 0.0
1981 6315 0.0 0.0 0.0
1982 6894 0.0 0.0 0.0
1983 5769 0.0 0.0 0.0
1984 7929 0.0 0.0 0.0
1985 7046 0.0 0.0 0.0
1986 8695 0.0 0.0 0.0
1987 8679 0.0 0.0 0.0
1988 8698 0.0 0.0 0.0
1989 8722 0.0 0.0 0.0
1990 8049 0.0 0.0 0.0
1991 8556 0.0 0.0 0.0
1992 8642 0.0 0.0 0.0
1993 8749 0.0 0.0 0.0
1994 8701 0.0 0.0 0.0
1995 6451 0.0 0.0 0.0

For data sources see[5]

References