X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214031714000

Well Details

Well ID: 0214031714000
Loading map...
Location: 00/14-17-021-03W4/0
Location Alias: 00/14-17-21-03 W4M
Location Alias 2: 00/14-17-021-03 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 03
Section: 17
County/Municipality: Special Areas No. 2
Well Name: HIGHFIELD ET AL ATLEE 14-17-21-3
Operator Name: Devon Canada Corporation
License Number: 0076683
License Date: 1979-06-29
License Status: RecCertified
Spud Date: 1979-08-04
Final Drill Date: 1979-08-05
Well Total Depth: 477.00 m
Surface Hole Latitude: 50.790030
Surface Hole Longitude: -110.386263

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-29 Obtained License
1979-08-05 Finished Drilling
1979-08-05 Production Casing Operation Performed
1979-08-05 Well Mode changed to Drilled and Cased
1979-08-27 Perforation Treatment Performed - Jet Perforation
1979-09-02 Perforation Treatment Performed - Fractured
1979-10-17 Well Began Production
1979-10-17 Well Fluid changed to Gas
1979-10-17 Well Mode changed to Flowing
1982-11-05 Perforation Treatment Performed - Jet Perforation
1982-11-13 Perforation Treatment Performed - Fractured
1995-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-04 Plug Back Performed
1995-10-04 Well Fluid changed to Gas
1995-10-04 Well Mode changed to Abandoned
1995-10-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-27 Perforation 437.00 439.00 7
1979-09-02 Fracture 437.00 439.00 0
1982-11-05 Perforation 373.00 375.00 3
1982-11-05 Perforation 354.00 356.00 3
1982-11-05 Perforation 350.00 352.00 3
1982-11-05 Perforation 345.50 346.50 3
1982-11-13 Fracture 345.50 375.00 0
1995-10-04 Packing Device Capped w/Cement 327.00 335.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1851 0.0 0.0 0.0
1980 7025 0.0 0.0 0.0
1981 7234 0.0 0.0 0.0
1982 7396 0.0 0.0 0.0
1983 4433 0.0 0.0 0.0
1984 6659 0.0 0.0 0.0
1985 7589 0.0 0.0 0.0
1986 8680 0.0 0.0 0.0
1987 8707 0.0 0.0 0.0
1988 8721 0.0 0.0 0.0
1989 8661 0.0 0.0 0.0
1990 8047 0.0 0.0 0.0
1991 8734 0.0 0.0 0.0
1992 8627 0.0 0.0 0.0
1993 8745 0.0 0.0 0.0
1994 8708 0.0 0.0 0.0
1995 6535 0.0 0.0 0.0

For data sources see[5]

References