X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214031608000

Well Details

Well ID: 0214031608000
Loading map...
Location: 00/08-16-021-03W4/0
Location Alias: 00/08-16-21-03 W4M
Location Alias 2: 00/08-16-021-03 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 03
Section: 16
County/Municipality: Special Areas No. 2
Well Name: CLARION ET AL ATLEE 8-16-21-3
Operator Name: Devon Canada Corporation
License Number: 0084510
License Date: 1980-07-28
License Status: RecCertified
Spud Date: 1980-08-14
Final Drill Date: 1980-08-14
Well Total Depth: 453.00 m
Surface Hole Latitude: 50.779710
Surface Hole Longitude: -110.351739

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-28 Obtained License
1980-08-14 Finished Drilling
1980-08-14 Well Mode changed to Drilled and Cased
1980-08-15 Production Casing Operation Performed
1980-09-02 Perforation Treatment Performed - Jet Perforation
1980-09-06 Perforation Treatment Performed - Fractured
1980-09-08 Perforation Treatment Performed - Selective Bullet Perforations
1980-09-09 Perforation Treatment Performed - Fractured
1980-10-01 Well Began Production
1980-10-01 Well Fluid changed to Gas
1980-10-01 Well Mode changed to Flowing
1995-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-04 Plug Back Performed
1995-10-04 Well Fluid changed to Gas
1995-10-04 Well Mode changed to Abandoned
1995-10-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-02 Perforation 419.70 421.70 7
1980-09-08 Selective Bullet Perforations 339.50 340.00 0
1980-09-08 Selective Bullet Perforations 346.50 347.80 0
1980-09-08 Selective Bullet Perforations 354.00 354.80 0
1980-09-08 Selective Bullet Perforations 355.70 355.70 0
1980-09-09 Fracture 327.70 355.70 0
1995-10-04 Packing Device Capped w/Cement 307.00 315.00 0
1980-09-06 Fracture 419.70 421.70 0
1980-09-08 Selective Bullet Perforations 327.70 328.40 0
1980-09-08 Selective Bullet Perforations 332.00 332.80 0
1980-09-08 Selective Bullet Perforations 333.60 335.50 0
1980-09-08 Selective Bullet Perforations 335.90 336.40 0
1980-09-08 Selective Bullet Perforations 336.80 337.30 0
1980-09-08 Selective Bullet Perforations 337.70 338.20 0
1980-09-08 Selective Bullet Perforations 338.60 339.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2191 0.0 0.0 0.0
1981 8235 0.0 0.0 0.0
1982 8200 0.0 0.0 0.0
1983 8736 0.0 0.0 0.0
1984 8748 0.0 0.0 0.0
1985 7324 0.0 0.0 0.0
1986 8739 0.0 0.0 0.0
1987 8732 0.0 0.0 0.0
1988 8761 0.0 0.0 0.0
1989 8731 0.0 0.0 0.0
1990 8057 0.0 0.0 0.0
1991 8745 0.0 0.0 0.0
1992 8638 0.0 0.0 0.0
1993 8742 0.0 0.0 0.0
1994 8705 0.0 0.0 0.0
1995 6534 0.0 0.0 0.0

For data sources see[5]

References