X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214030808000

Well Details

Well ID: 0214030808000
Loading map...
Location: 00/08-08-021-03W4/0
Location Alias: 00/08-08-21-03 W4M
Location Alias 2: 00/08-08-021-03 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 03
Section: 08
County/Municipality: Special Areas No. 2
Well Name: CLARION ET AL ATLEE 8-8-21-3
Operator Name: Devon Canada Corporation
License Number: 0084501
License Date: 1980-07-28
License Status: Re-Entered
Spud Date: 1980-08-18
Final Drill Date: 1980-08-18
Well Total Depth: 489.00 m
Surface Hole Latitude: 50.765502
Surface Hole Longitude: -110.379742

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-28 Obtained License
1980-08-18 Finished Drilling
1980-08-18 Well Mode changed to Drilled and Cased
1980-08-19 Production Casing Operation Performed
1980-09-01 Perforation Treatment Performed - Jet Perforation
1980-09-05 Perforation Treatment Performed - Fractured
1980-09-08 Perforation Treatment Performed - Selective Bullet Perforations
1980-09-09 Perforation Treatment Performed - Fractured
1980-10-01 Well Began Production
1980-10-01 Well Fluid changed to Gas
1980-10-01 Well Mode changed to Flowing
1995-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-05 Plug Back Performed
1995-10-05 Well Fluid changed to Gas
1995-10-05 Well Mode changed to Abandoned
1995-10-06 Well Fluid changed to Gas
1995-10-06 Well Mode changed to Abandoned and Re-entered
1995-10-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-01 Perforation 457.00 459.00 7
1980-09-08 Selective Bullet Perforations 392.90 393.20 0
1980-09-08 Selective Bullet Perforations 393.50 397.20 0
1980-09-08 Selective Bullet Perforations 400.30 400.30 0
1980-09-09 Fracture 370.40 400.30 0
1995-10-05 Packing Device Capped w/Cement 350.00 358.00 0
1980-09-05 Fracture 457.00 459.00 0
1980-09-08 Selective Bullet Perforations 370.40 371.00 0
1980-09-08 Selective Bullet Perforations 373.70 374.20 0
1980-09-08 Selective Bullet Perforations 374.80 375.30 0
1980-09-08 Selective Bullet Perforations 375.90 376.40 0
1980-09-08 Selective Bullet Perforations 380.00 380.70 0
1980-09-08 Selective Bullet Perforations 381.40 381.90 0
1980-09-08 Selective Bullet Perforations 391.80 392.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2189 0.0 0.0 0.0
1981 8716 0.0 0.0 0.0
1982 7281 0.0 0.0 0.0
1983 3021 0.0 0.0 0.0
1984 7608 0.0 0.0 0.0
1985 7791 0.0 0.0 0.0
1986 8718 0.0 0.0 0.0
1987 8700 0.0 0.0 0.0
1988 8587 0.0 0.0 0.0
1989 8734 0.0 0.0 0.0
1990 8047 0.0 0.0 0.0
1991 8682 0.0 0.0 0.0
1992 8649 0.0 0.0 0.0
1993 8755 0.0 0.0 0.0
1994 8712 0.0 0.0 0.0
1995 6542 0.0 0.0 0.0

For data sources see[5]

References