X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0214022810000

Well Details

Well ID: 0214022810000
Loading map...
Location: 00/10-28-021-02W4/0
Location Alias: 00/10-28-21-02 W4M
Location Alias 2: 00/10-28-021-02 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 02
Section: 28
County/Municipality: Special Areas No. 2
Well Name: INTENSITY ET AL MEDHAT 10-28-21-2
Operator Name: Canadian Natural Resources Limited
License Number: 0160841
License Date: 1993-09-07
License Status: Re-Entered
Spud Date: 1993-09-24
Final Drill Date: 1993-09-27
Well Total Depth: 918.00 m
Surface Hole Latitude: 50.814975
Surface Hole Longitude: -110.223004

For data sources see[1][2]

Well History

Date Event
1993-09-07 Obtained License
1993-09-25 Surface Casing Operation Performed
1993-09-27 Finished Drilling
1993-09-27 Well Mode changed to Drilled and Cased
1993-09-28 Production Casing Operation Performed
1993-09-28 Well Log Performed
1993-09-29 Rig Released
1993-10-07 Perforation Treatment Performed - Jet Perforation
1993-10-07 Well Log Performed
1993-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-08 Perforation Treatment Performed - Jet Perforation
1993-10-08 Well Log Performed
1993-11-05 Well Began Production
1993-11-05 Well Fluid changed to Gas
1993-11-05 Well Mode changed to Flowing
1995-01-18 Well Fluid changed to Gas
1995-01-18 Well Mode changed to Suspended
1997-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-06 Plug Back Performed
1997-11-10 Perforation Treatment Performed - Jet Perforation
1997-11-10 Perforation Treatment Performed - Remedial Casing
1997-11-10 Well Log Performed
1997-11-20 Well Abandoned
1997-11-20 Well Fluid changed to Gas
1997-11-20 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-10-07 Perforation 890.00 892.00 17
1993-10-08 Packing Device Capped w/Cement 877.00 885.00 0
1993-10-08 Perforation 708.00 708.50 17
1997-10-06 Packing Device Capped w/Cement 692.00 700.00 0
1997-11-10 Perforation 281.00 282.00 10
1997-11-10 Remedial Casing Cementing 281.00 282.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1364 0.0 0.0 0.0
1994 8560 0.0 0.0 0.0
1995 576 0.0 0.0 0.0

For data sources see[5]

References