X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205032201020

Well Details

Well ID: 0205032201020
Loading map...
Location: 02/01-22-020-03W5/0
Location Alias: 02/01-22-20-03 W5M
Location Alias 2: 02/01-22-020-03 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 22
County/Municipality: Foothills County
Well Name: ROYALITE MODEL NO. 1
Operator Name: Devon Canada Corporation
License Number: B0000181
License Date: 1941-03-11
License Status: RecCertified
Spud Date: 1941-04-22
Final Drill Date: 1941-08-19
Well Total Depth: 2323.50 m
Surface Hole Latitude: 50.704849
Surface Hole Longitude: -114.327993

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1941-03-11 Obtained License
1941-08-04 Production Casing Operation Performed
1941-08-19 Finished Drilling
1941-08-19 Perforation Treatment Performed - Open-Hole Completion
1941-08-19 Well Mode changed to Drilled and Cased
1941-08-20 Well Began Production
1941-08-20 Well Fluid changed to Crude Oil
1941-08-20 Well Mode changed to Flowing
1941-08-21 Perforation Treatment Performed - Acid Wash - No Pressure
1941-08-28 Perforation Treatment Performed - Acid Wash - No Pressure
1969-12-31 Well Began Injection
1969-12-31 Well Fluid changed to Water
1969-12-31 Well Type changed to Injection
1990-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-19 Plug Back Performed
1990-09-19 Well Fluid changed to Water
1990-09-19 Well Mode changed to Abandoned
1990-09-19 Well Type changed to Injection
1990-09-29 Perforation Treatment Performed - Cement Plug
1990-09-30 Perforation Treatment Performed - Cement Plug
1990-10-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1941-08-19 Open Hole/Barefoot Completion 2143.40 2323.50 0
1941-08-21 Acid Wash 2203.70 2316.50 0
1941-08-28 Acid Wash 2203.70 2316.50 0
1990-09-19 Packing Device Capped w/Cement 2097.00 2105.00 0
1990-09-29 Cement Plug 830.80 1209.00 0
1990-09-30 Cement Plug 494.60 830.80 0
1990-09-30 Cement Plug 0.10 182.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8482 0.0 0.0 0.0
1968 693 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0

For data sources see[5]

References