X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205031214032

Well Details

Well ID: 0205031214032
Loading map...
Location: 03/14-12-020-03W5/2
Location Alias: 03/14-12-20-03 W5M
Location Alias 2: 03/14-12-020-03 W5/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 12
County/Municipality: Foothills County
Well Name: CPEC 103 TV 14-12-20-3
Operator Name: Crescent Point Energy Corp.
License Number: 0012004
License Date: 1956-08-22
License Status: Issued
Spud Date: 1927-05-25
Final Drill Date: 1930-11-13
Well Total Depth: 1726.70 m
Surface Hole Latitude: 50.684880
Surface Hole Longitude: -114.291291

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1927-06-03 Conductor Casing Operation Performed
1927-07-13 Surface Casing Operation Performed
1927-10-04 Intermediate Casing Operation Performed
1927-10-06 Perforation Treatment Performed - Open-Hole Completion
1928-07-01 Perforation Treatment Performed - Cement Squeeze
1928-07-28 Intermediate Casing Operation Performed
1928-09-15 Intermediate Casing Operation Performed
1928-11-14 Production Casing Operation Performed
1930-11-13 Finished Drilling
1930-11-13 Perforation Treatment Performed - Open-Hole Completion
1930-11-13 Well Mode changed to Drilled and Cased
1930-11-14 Well Began Production
1930-11-14 Well Fluid changed to Gas
1930-11-14 Well Mode changed to Flowing
1931-01-03 Perforation Treatment Performed - Fractured
1956-08-22 Obtained License
2018-10-24 Well Log Performed
2019-01-01 Well Fluid changed to Gas
2019-01-01 Well Mode changed to Suspended
2019-01-14 Perforation Treatment Performed - Cement Squeeze
2019-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-15 Perforation Treatment Performed - Jet Perforation
2019-01-15 Plug Back Performed
2019-01-15 Well Log Performed
2019-01-16 Perforation Treatment Performed - Remedial Casing
2019-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-17 Plug Back Performed
2019-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-18 Plug Back Performed
2019-01-21 Well Log Performed
2019-01-22 Perforation Treatment Performed - Jet Perforation
2019-01-23 Perforation Treatment Performed - Remedial Casing
2019-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-24 Perforation Treatment Performed - Jet Perforation
2019-01-24 Plug Back Performed
2019-01-24 Well Log Performed
2019-01-25 Perforation Treatment Performed - Remedial Casing
2019-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-28 Perforation Treatment Performed - Jet Perforation
2019-01-28 Plug Back Performed
2019-01-28 Well Log Performed
2019-01-29 Perforation Treatment Performed - Remedial Casing
2019-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-30 Perforation Treatment Performed - Jet Perforation
2019-01-30 Plug Back Performed
2019-01-30 Well Log Performed
2019-01-31 Perforation Treatment Performed - Remedial Casing
2019-02-01 Perforation Treatment Performed - Jet Perforation
2019-02-01 Perforation Treatment Performed - Remedial Casing
2019-02-01 Well Log Performed
2019-02-05 Perforation Treatment Performed - Jet Perforation
2019-02-06 Perforation Treatment Performed - Remedial Casing
2019-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-07 Plug Back Performed
2019-02-07 Well Log Performed
2019-02-08 Perforation Treatment Performed - Jet Perforation
2019-02-08 Well Log Performed
2019-02-11 Perforation Treatment Performed - Remedial Casing
2019-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-12 Perforation Treatment Performed - Jet Perforation
2019-02-12 Plug Back Performed
2019-02-12 Well Log Performed
2019-02-13 Perforation Treatment Performed - Remedial Casing
2019-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-19 Perforation Treatment Performed - Jet Perforation
2019-02-19 Plug Back Performed
2019-02-19 Well Log Performed
2019-02-20 Perforation Treatment Performed - Jet Perforation
2019-02-20 Perforation Treatment Performed - Remedial Casing
2019-02-20 Well Log Performed
2019-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-26 Perforation Treatment Performed - Jet Perforation
2019-02-26 Perforation Treatment Performed - Remedial Casing
2019-02-26 Plug Back Performed
2019-02-26 Well Log Performed
2019-02-27 Perforation Treatment Performed - Remedial Casing
2019-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-28 Plug Back Performed
2019-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-04 Plug Back Performed
2019-03-04 Well Fluid changed to Gas
2019-03-04 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1927-10-06 Open Hole/Barefoot Completion 794.60 806.50 0
2019-01-16 Remedial Casing Cementing 1353.00 1353.80 0
2019-01-17 Packing Device Capped w/Cement 1335.00 1409.50 0
2019-01-18 Packing Device Capped w/Cement 1270.40 1303.00 0
2019-01-22 Perforation 1257.00 1258.00 20
2019-01-23 Remedial Casing Cementing 1257.00 1258.00 0
2019-01-24 Packing Device Capped w/Cement 1241.00 1250.00 0
2019-01-24 Perforation 814.00 815.00 20
2019-01-25 Remedial Casing Cementing 814.00 815.00 0
2019-01-28 Packing Device Capped w/Cement 800.00 808.00 0
2019-01-28 Perforation 797.00 798.00 20
1928-07-01 Cement Squeeze 794.60 806.50 0
2019-01-29 Remedial Casing Cementing 797.00 798.00 0
2019-01-30 Packing Device Capped w/Cement 772.00 779.00 0
2019-01-30 Perforation 717.00 718.00 20
2019-01-31 Remedial Casing Cementing 717.00 718.00 0
2019-02-01 Perforation 711.00 712.00 14
2019-02-01 Remedial Casing Cementing 711.00 712.00 0
2019-02-05 Perforation 610.00 611.00 13
2019-02-06 Remedial Casing Cementing 610.00 611.00 0
2019-02-07 Packing Device Capped w/Cement 594.60 606.00 0
2019-02-08 Perforation 574.00 575.00 13
1930-11-13 Open Hole/Barefoot Completion 1543.20 1726.70 0
2019-02-08 Perforation 435.00 436.00 13
2019-02-11 Remedial Casing Cementing 574.00 575.00 0
2019-02-11 Remedial Casing Cementing 435.00 436.00 0
2019-02-12 Packing Device Capped w/Cement 419.90 430.00 0
2019-02-12 Perforation 406.00 407.00 39
2019-02-13 Remedial Casing Cementing 406.00 407.00 0
2019-02-19 Packing Device Capped w/Cement 392.10 404.00 0
2019-02-19 Perforation 341.00 342.00 39
2019-02-19 Perforation 145.00 146.00 39
2019-02-20 Perforation 320.00 321.00 39
1931-01-03 Fracture 1543.20 1726.70 0
2019-02-20 Remedial Casing Cementing 341.00 342.00 0
2019-02-26 Remedial Casing Cementing 320.00 321.00 0
2019-02-26 Packing Device Capped w/Cement 300.00 318.00 0
2019-02-26 Perforation 165.00 166.00 20
2019-02-27 Remedial Casing Cementing 165.00 166.00 0
2019-02-28 Packing Device Capped w/Cement 146.00 161.00 0
2019-03-04 Packing Device Capped w/Cement 123.50 140.00 0
2019-01-14 Cement Squeeze 1543.20 1726.70 0
2019-01-15 Packing Device Capped w/Cement 1410.20 1492.00 0
2019-01-15 Perforation 1390.00 1390.80 20
2019-01-15 Perforation 1353.00 1353.80 20
2019-01-16 Remedial Casing Cementing 1390.00 1390.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6594 0.0 0.0 0.0
1985 4212 0.0 0.0 0.0
1986 7081 0.0 0.0 0.0
1987 8427 0.0 0.0 0.0
1988 8519 0.0 0.0 0.0
1989 8461 0.0 0.0 0.0
1990 8748 0.0 0.0 0.0
1991 8178 0.0 0.0 0.0
1992 8228 0.0 0.0 0.0
1993 8380 0.0 0.0 0.0
1994 8476 0.0 0.0 0.0
1995 8495 0.0 0.0 0.0
1996 8717 0.0 0.0 0.0
1997 8748 0.0 0.0 0.0
1998 8173 0.0 0.0 0.0
1999 8622 0.0 0.0 0.0
2000 5852 0.0 0.0 0.0
2001 7900 0.0 0.0 0.0
2002 8666 0.0 0.0 0.0
2003 8542 0.0 0.0 0.0
2004 7840 0.0 0.0 0.0
2005 7033 0.0 0.0 0.0
2006 8342 0.0 0.0 0.0
2007 4770 0.0 0.0 0.0
2008 4513 0.0 0.0 0.0
2009 5842 0.0 0.0 0.0
2010 7453 0.0 0.0 0.0
2011 7522 0.0 0.0 0.0
2012 8546 0.0 0.0 0.0
2013 7510 0.0 0.0 0.0
2014 6849 0.0 0.0 0.0
2015 8263 0.0 0.0 0.0
2016 7352 0.0 0.0 0.0
2017 7669 0.0 0.0 0.0
2018 6163 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References