X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205031206002

Well Details

Well ID: 0205031206002
Loading map...
Location: 00/06-12-020-03W5/2
Location Alias: 00/06-12-20-03 W5M
Location Alias 2: 00/06-12-020-03 W5/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 12
County/Municipality: Foothills County
Well Name: CPEC TV 6-12-20-3
Operator Name: Crescent Point Energy Corp.
License Number: 0011987
License Date: 1956-08-22
License Status: Abandoned
Spud Date: 1928-07-26
Final Drill Date: 1929-12-26
Well Total Depth: 1610.30 m
Surface Hole Latitude: 50.680589
Surface Hole Longitude: -114.291287

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1929-02-11 Well Mode changed to Drilled and Cased
1929-10-06 Well Fluid changed to Crude Oil
1929-10-06 Well Mode changed to Potential
1929-10-07 Well Fluid changed to Crude Oil
1929-10-07 Well Mode changed to Abandoned Zone
1929-10-25 Production Casing Operation Performed
1929-12-26 Finished Drilling
1929-12-26 Perforation Treatment Performed - Open-Hole Completion
1931-07-03 Perforation Treatment Performed - Open-Hole Completion
1931-07-10 Perforation Treatment Performed - Fractured
1956-08-22 Obtained License
2018-01-25 Well Log Performed
2018-01-30 Well Log Performed
2018-01-31 Well Log Performed
2018-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-02 Plug Back Performed
2018-02-05 Perforation Treatment Performed - Jet Perforation
2018-02-05 Well Log Performed
2018-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-06 Plug Back Performed
2018-02-07 Well Log Performed
2018-02-08 Perforation Treatment Performed - Jet Perforation
2018-02-08 Well Log Performed
2018-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-09 Perforation Treatment Performed - Remedial Casing
2018-02-09 Plug Back Performed
2018-02-12 Perforation Treatment Performed - Jet Perforation
2018-02-12 Well Log Performed
2018-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-16 Perforation Treatment Performed - Remedial Casing
2018-02-16 Plug Back Performed
2018-02-20 Perforation Treatment Performed - Jet Perforation
2018-02-20 Well Log Performed
2018-02-21 Well Log Performed
2018-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-23 Perforation Treatment Performed - Remedial Casing
2018-02-23 Plug Back Performed
2018-02-26 Perforation Treatment Performed - Jet Perforation
2018-02-26 Well Log Performed
2018-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-27 Plug Back Performed
2018-02-28 Perforation Treatment Performed - Jet Perforation
2018-02-28 Well Log Performed
2018-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-01 Plug Back Performed
2018-03-01 Well Log Performed
2018-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-02 Perforation Treatment Performed - Remedial Casing
2018-03-02 Plug Back Performed
2018-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-05 Perforation Treatment Performed - Jet Perforation
2018-03-05 Plug Back Performed
2018-03-05 Well Log Performed
2018-03-06 Perforation Treatment Performed - Jet Perforation
2018-03-07 Perforation Treatment Performed - Jet Perforation
2018-03-07 Well Log Performed
2018-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-08 Perforation Treatment Performed - Remedial Casing
2018-03-08 Plug Back Performed
2018-03-08 Well Log Performed
2018-05-31 Well Abandoned
2018-05-31 Well Fluid changed to Crude Oil
2018-05-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1929-12-26 Open Hole/Barefoot Completion 1545.60 1576.70 0
2018-02-12 Perforation 1025.00 1026.00 25
2018-02-16 Remedial Casing Cementing 1025.00 1026.00 0
2018-02-16 Packing Device Capped w/Cement 962.00 1022.00 0
2018-02-20 Perforation 682.00 683.00 25
2018-02-20 Perforation 800.00 801.00 17
2018-02-23 Remedial Casing Cementing 800.00 801.00 0
2018-02-23 Packing Device Capped w/Cement 666.70 685.00 0
2018-02-26 Perforation 620.00 621.00 25
2018-02-27 Packing Device Capped w/Cement 616.60 637.00 0
2018-02-28 Perforation 460.00 461.00 25
1931-07-03 Open Hole/Barefoot Completion 1545.60 1610.30 0
2018-02-28 Perforation 370.00 371.00 25
2018-03-01 Packing Device Capped w/Cement 601.00 616.00 0
2018-03-02 Remedial Casing Cementing 460.00 461.00 0
2018-03-02 Packing Device Capped w/Cement 342.80 374.00 0
2018-03-05 Perforation 220.00 221.00 25
2018-03-05 Packing Device Capped w/Cement 205.20 237.00 0
2018-03-06 Perforation 108.00 109.00 25
2018-03-07 Perforation 97.00 98.00 25
2018-03-08 Remedial Casing Cementing 97.00 98.00 0
2018-03-08 Packing Device Capped w/Cement 85.00 94.00 0
1931-07-10 Fracture 1577.30 1607.80 0
2018-02-02 Packing Device Capped w/Cement 1503.80 1535.00 0
2018-02-05 Perforation 1464.00 1465.00 25
2018-02-06 Packing Device Capped w/Cement 1438.50 1461.00 0
2018-02-08 Perforation 1362.00 1363.00 25
2018-02-09 Remedial Casing Cementing 1362.00 1363.00 0
2018-02-09 Packing Device Capped w/Cement 1320.70 1381.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References