X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205030207000

Well Details

Well ID: 0205030207000
Loading map...
Location: 00/07-02-020-03W5/0
Location Alias: 00/07-02-20-03 W5M
Location Alias 2: 00/07-02-020-03 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 02
County/Municipality: Foothills County
Well Name: ROYALITE #79
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: B0000702
License Date: 1944-06-21
License Status: RecCertified
Spud Date: 1944-07-28
Final Drill Date: 1944-12-18
Well Total Depth: 2455.80 m
Surface Hole Latitude: 50.664856
Surface Hole Longitude: -114.310618

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1944-06-21 Obtained License
1944-12-05 Production Casing Operation Performed
1944-12-18 Finished Drilling
1944-12-18 Perforation Treatment Performed - Open-Hole Completion
1944-12-18 Well Mode changed to Drilled and Cased
1944-12-19 Well Began Production
1944-12-19 Well Fluid changed to Crude Oil
1944-12-19 Well Mode changed to Flowing
1944-12-20 Perforation Treatment Performed - Acid Wash - No Pressure
1944-12-24 Perforation Treatment Performed - Acid Wash - No Pressure
1944-12-26 Perforation Treatment Performed - Acid Wash - No Pressure
1944-12-28 Perforation Treatment Performed - Acid Wash - No Pressure
1952-06-21 Well Fluid changed to Crude Oil
1952-06-21 Well Mode changed to Pumping
1963-12-08 Well Fluid changed to Crude Oil
1963-12-08 Well Mode changed to Gas Lift
1993-06-24 Well Log Performed
1993-06-25 Perforation Treatment Performed - Cement Plug
1993-06-25 Plug Back Performed
1993-06-28 Perforation Treatment Performed - Cement Plug
1993-06-28 Well Fluid changed to Crude Oil
1993-06-28 Well Mode changed to Abandoned
1993-06-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1944-12-18 Open Hole/Barefoot Completion 2315.00 2455.80 0
1944-12-20 Acid Wash 2345.40 2447.50 0
1944-12-24 Acid Wash 2345.40 2447.50 0
1944-12-26 Acid Wash 2345.40 2447.50 0
1944-12-28 Acid Wash 2345.40 2447.50 0
1993-06-25 Cement Plug 2252.00 2452.00 0
1993-06-28 Cement Plug 0.10 190.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 8364 0.0 0.0 0.0
1970 8667 0.0 0.0 0.0
1971 8704 0.0 0.0 0.0
1972 8037 0.0 0.0 0.0
1973 8615 0.0 0.0 0.0
1974 8520 0.0 0.0 0.0
1975 7703 0.0 0.0 0.0
1976 7484 0.0 0.0 0.0
1977 5087 0.0 0.0 0.0

For data sources see[5]

References